|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 8119 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | | Wellbore Permit | | | Permit #: | 20064984 | Expiration Date: | 11/12/2007 | | Proposed Depth/Form: | 8119 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NW4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 945 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 945 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8073 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 800, Top: 4051 ft., Bottom: 8073 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/1/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 8119 ft. | Measured PB depth: | 8038 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CNCD, DIGR, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 945 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 945 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8073 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 4051 ft., Bottom: 8073 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 1250 ft., Depth: 8072 ft., Bottom: 4000 ft., Sacks: 750, Method: NON CEMENT SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4494 ft. | | N | N | | FORT HAYS | 7447 ft. | | N | N | | CODELL | 7473 ft. | | N | N | | J SAND | 7929 ft. | | N | N |
Formation JSND Formation Classification: OW Status: SI - 4/1/2022 Interval Top: 7930 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/5/2007 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/21/2013 | Treatment End Date: | N/A | | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB-CD PRODUCTION. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 6/6/2011 | | Treatment Summary: | SAND PLUG SET @ 8001 | | Formation Treatment | | Treatment Date: | 2/22/2007 | | Treatment Summary: | J-REC. PERF & FRAC JSND W/160,860 GALS. FLUID & 116,040# 30/50 SAND PERFS 7930-7937 (2SPF) 7946-7973 (2SPF) 7983-7990 (2SPF) |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7930 ft. | # Of Holes: | 82 | | Interval Bottom: | 7990 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 7/14/2011 Interval Top: 7474 ft. Interval Bottom: 7490 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/7/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/23/2011 | | Treatment Summary: | CDL REPERF (6/8/2011) 7476-7490 HOLES 14 SIZE .38
Frac Codell down 4-1/2" Csg w/ 204,498 gal Slickwater w/ 150,280# 40/70, 4,000# SB Excel, 0# . | | Formation Treatment | | Treatment Date: | 6/1/2005 | | Treatment Summary: | 149749 GAL FLUID FRAC INFO REPRESENTS; CODL 115560 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 5450 | | CALC_MCF_GAS | 109 | | CASING_PRESS | 500 | | GRAVITY_OIL | 55 | | MCF_GAS | 109 | | TUBING_PRESS | 225 |
| | Perforation Data: | | Interval Top: | 7474 ft. | # Of Holes: | 62 | | Interval Bottom: | 7490 ft. | Hole Size: | 0.45 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/25/2007 Interval Top: 7474 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 3/5/2007 | Choke Size: | 0.375 in. | | Formation Name: | J-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/1/2005 | | Treatment Summary: | CODL PERFS 5/31/05 7474-7490 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7900 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1231 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 59000 | | CALC_MCF_GAS | 177 | | CASING_PRESS | 400 | | GRAVITY_OIL | 54 | | TUBING_PRESS | 260 |
| | Perforation Data: | | Interval Top: | 7474 ft. | # Of Holes: | | | Interval Bottom: | 7990 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 5/30/2013 Interval Top: 7247 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/24/2013 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/30/2013 | Treatment End Date: | N/A | | Treatment Summary: | CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB-CD PRODUCTION. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7895 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/30/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1236 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 16000 | | CALC_MCF_GAS | 16 | | CASING_PRESS | 890 | | GRAVITY_OIL | 52 | | MCF_GAS | 16 | | TUBING_PRESS | 761 |
| | Perforation Data: | | Interval Top: | 7247 ft. | # Of Holes: | 144 | | Interval Bottom: | 7990 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 4/1/2022 Interval Top: 7247 ft. Interval Bottom: 7490 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/7/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/23/2011 | | Treatment Summary: | CDRF-NBREC |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7466 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/11/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1257 | | CALC_GOR | 1293 | | CALC_MCF_GAS | 6 | | CASING_PRESS | 513 | | GRAVITY_OIL | 50 | | MCF_GAS | 6 | | TUBING_PRESS | 141 |
| | Perforation Data: | | Interval Top: | 7247 ft. | # Of Holes: | 144 | | Interval Bottom: | 7490 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 8/3/2011 Interval Top: 7247 ft. Interval Bottom: 7332 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/7/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/23/2011 | | Treatment Summary: | Frac Niobrara B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 239,190 gal Slickwater w/ 200,440# 40/70, 4,000# SB Excel, 0# . |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7247 ft. | # Of Holes: | 82 | | Interval Bottom: | 7332 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 03/31/2022 |
| Low Producing | Y | Production Period 02/2025 - 01/2026 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|