Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22875
Well Classification: OW Status: PA - 6/14/2018
Well Name/No:PARKVIEW SOUTH #A3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/14/2018
FacilityID:276935LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4668 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:210FNL  750 FELLat/Long: 40.391245 / -104.680559Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.391270 / -104.680510Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/14/2018             Measured TD: 8140 ft.    Vertical TD: 7230 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/14/2018
Wellbore PermitDIRECTIONAL
Permit #:20050582 Expiration Date:4/3/2006
Proposed Top PZ Location:Sec:16 Twp: 5N 65W Footage: 1997 FSL  2078 FWL
Bottom Hole Location:Sec:16 Twp: 5N 65W Footage: 1997 FSL  2078 FWL
Proposed Depth/Form:8820 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SW

Wellbore Completed
Completion Date:10/11/2005
Spud Date:10/3/2005Spud Date Is:ACTUAL
Measured TD:8140 ft.Measured PB depth:8092 ft.
True Vertical TD:7230 ft.True Vertical PB depth:7183 ft.
Top PZ Location:Sec:16 Twp: 5N 65WFootage: 2106 FSL  1826 FWL
Bottom Hole Location:Sec:16 Twp: 5N 65WFootage: 2106 FSL  1826 FWL
Log Types:CNL, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1607 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 610, Top: 0 ft., Bottom: 1607 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8135 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 3050 ft., Bottom: 8135 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4843 ft.4997 ft.NN
NIOBRARA7656 ft.7956 ft.NN
CODELL7980 ft.7998 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/12/2011                 Interval Top: 7980 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/31/2011
Treatment Summary:Re-frac CODL w/ 128,604 gal fluid and 251,840# 20/40 sand (31,916 gal SW, 96,688 gal xlink gel) ISIP=2152, ISDP=3490, ATP=5253, ATR=46.7
Formation Treatment
Treatment Date:10/11/2005
Treatment Summary:121,485 GAL GEL, 240,290# 20/40 SAND AND 10,000# 20/40 RCS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 28
BTU_GAS 1198
CALC_BBLS_H2O 2
CALC_BBLS_OIL 28
CALC_GOR 5429
CALC_MCF_GAS 152
CASING_PRESS 320
GRAVITY_OIL 55
MCF_GAS 152
Perforation Data:
Interval Top:7980 ft.# Of Holes:40
Interval Bottom:7990 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/14/2018                 Interval Top: 7667 ft.    Interval Bottom: 7990 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/12/2011Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7950 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/26/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 7
BTU_GAS 1294
CALC_BBLS_H2O 6
CALC_BBLS_OIL 7
CALC_GOR 3714
CALC_MCF_GAS 26
CASING_PRESS 800
GRAVITY_OIL 63
MCF_GAS 26
TUBING_PRESS 650
Perforation Data:
Interval Top:7667 ft.# Of Holes:88
Interval Bottom:7990 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/2/2014                  Interval Top: 7667 ft.    Interval Bottom: 7808 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/30/2011
Treatment Summary:Perf. Frac NBRR A [7,667'-7,673'] & NBRR B [7,802'-7,808'] w/ 222,474 gal fluid (126,840 gal SLKW, 95,634 gal XLG)& 293,920# sand (240,020# 20/40 & 53,900# 40/70), ISIP=3435, ISDP=3795, ATP=5303, ATR=57.2, MTR=56.9
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7667 ft.# Of Holes:48
Interval Bottom:7808 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/14/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No