Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22868
Well Classification: OW Status: PA - 4/4/2018
Well Name/No:HIGHWAY 85-1 #B12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/4/2018
FacilityID:276907LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:WATTENBERG - #90750Elevation:4669 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:150FNL  824 FELLat/Long: 40.391450 / -104.680810Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.391450 / -104.680790Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 4/4/2018             Measured TD: 8000 ft.    Vertical TD: 7897 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 4/4/2018
Wellbore PermitDIRECTIONAL
Permit #:20050597 Expiration Date:3/30/2006
Proposed Top PZ Location:Sec:17 Twp: 5N 65W Footage: 668 FSL  665 FEL
Bottom Hole Location:Sec:17 Twp: 5N 65W Footage: 668 FSL  665 FEL
Proposed Depth/Form:7900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SE

Wellbore Completed
Completion Date:9/22/2005
Spud Date:8/5/2005Spud Date Is:ACTUAL
Measured TD:8000 ft.Measured PB depth:7993 ft.
True Vertical TD:7897 ft.True Vertical PB depth:7890 ft.
Top PZ Location:Sec:17 Twp: 5N 65WFootage: 628 FSL  550 FEL
Bottom Hole Location:Sec:17 Twp: 5N 65WFootage: 628 FSL  550 FEL
Log Types:DIL, DEN, NEU, CBL, MUD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 462 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 258, Top: 0 ft., Bottom: 462 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7996 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 3390 ft., Bottom: 7996 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4420 ft.4478 ft.NN
NIOBRARA6866 ft.7160 ft.NN
CODELL7183 ft.7198 ft.NN
J SAND7755 ft.7795 ft.NN
DAKOTA7877 ft.7990 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/9/2011                  Interval Top: 7184 ft.    Interval Bottom: 7194 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/31/2011
Treatment Summary:Re-frac CODL w/ w/ 128,100 gal fluid and 250,200# 20/40 sand (31,920 gal SW, 96,180 gal xlink gel), 1000 gals 15% HCl ISIP=2930, ISDP=3880, ATP=4036, ATR=21.2
Formation Treatment
Treatment Date:9/22/2005
Treatment Summary:9/19/05 127,000 GAL GEL, 243,920# 20/40 SAND AND 10,000# 20/40 RCS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 33
BTU_GAS 1255
CALC_BBLS_H2O 10
CALC_BBLS_OIL 33
CALC_GOR 9394
CALC_MCF_GAS 310
CASING_PRESS 920
GRAVITY_OIL 57
MCF_GAS 310
Perforation Data:
Interval Top:7184 ft.# Of Holes:40
Interval Bottom:7194 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 4/4/2018                  Interval Top: 6883 ft.    Interval Bottom: 7194 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/9/2011Choke Size:0.000 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7167 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/19/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 41
BBLS_OIL 26
BTU_GAS 1294
CALC_BBLS_H2O 41
CALC_BBLS_OIL 26
CALC_GOR 10538
CALC_MCF_GAS 274
CASING_PRESS 1900
GRAVITY_OIL 62
MCF_GAS 274
TUBING_PRESS 1700
Perforation Data:
Interval Top:6883 ft.# Of Holes:88
Interval Bottom:7194 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/2/2014                  Interval Top: 6883 ft.    Interval Bottom: 7014 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/31/2011
Treatment Summary:Perf. Frac NBRR A [6,883'-6,889'] & NBRR B [7,008'-7,014'] w/ 220,878 gal fluid (125,412 gal SLKW, 95,466 gal XLG)& 297,150# sand (243,400# 20/40 & 53,750# 40/70) ISIP=3520, ISDP=3550, ATP=4857, ATR=53.7
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6883 ft.# Of Holes:48
Interval Bottom:7014 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/04/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No