|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2025 Measured TD: 8180 ft. Vertical TD: 8062 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20070001 | Expiration Date: | 1/29/2008 | | Proposed Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 1318 FSL 2599 FWL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 1318 FSL 2557 FEL | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S2 GWA | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5200 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4150 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/23/2007 | | Spud Date: | 4/15/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8180 ft. | Measured PB depth: | 8080 ft. | | True Vertical TD: | 8062 ft. | True Vertical PB depth: | 7962 ft. | | Top PZ Location: | Sec:4 Twp: 2N 67W | Footage: 1311 FSL 2628 FEL | | Bottom Hole Location: | Sec:4 Twp: 2N 67W | Footage: 1311 FSL 2628 FEL | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 600 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8125 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7112 ft., Bottom: 8125 ft., Determination Method: | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5404 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4132 ft., Bottom: 5492 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4424 ft. | | N | N | | SHANNON | 4974 ft. | | N | N | | NIOBRARA | 7308 ft. | | N | N | | CODELL | 7564 ft. | | N | N | | J SAND | 8004 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2025 Interval Top: 8004 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/10/2007 | | Treatment Summary: | SEE DOC# 2058050 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8004 ft. | # Of Holes: | 60 | | Interval Bottom: | 8048 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 12/8/2011 Interval Top: 7352 ft. Interval Bottom: 8048 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/17/2011 | | Treatment Summary: | CIBP SET AT 7620'- 8/13/2011; CFP SET @ 7410' 8/19/11. DRILLED OUT 9/1/11. PRODUCTION TUBING 2 3/8 @ 7562 ON 9/2/2011. COMMINGLED ON 9/10/11. | | Formation Treatment | | Treatment Date: | 4/23/2007 | | Treatment Summary: | SEE DOC #2058051 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7562 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/17/2011 | Test Method: | FLOWING | | Hours Tested: | 5 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 51 | | BBLS_OIL | 13 | | BTU_GAS | 53 | | CALC_BBLS_H2O | 51 | | CALC_BBLS_OIL | 62 | | CALC_GOR | 3403 | | CALC_MCF_GAS | 211 | | CASING_PRESS | 718 | | GRAVITY_OIL | 129 | | MCF_GAS | 44 | | TUBING_PRESS | 433 |
| | Perforation Data: | | Interval Top: | 7352 ft. | # Of Holes: | 180 | | Interval Bottom: | 8048 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 7352 ft. Interval Bottom: 7584 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/13/2011 | | Treatment Summary: | CODELL REFRAC – FRAC’D 7564’-7484’, W/64,000# SAND 99,582 GAL FRAC. NIOBRARA REFRAC 7352-7372 W/215,660 # SAND 137,627 GAL; SET CIBP @ 7620' AND CFP @ 7410'. BHOTH DRILLED OUT 9/1/2011. | | Formation Treatment | | Treatment Date: | 5/11/2007 | | Treatment Summary: | SEE DOC #2058050 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7352 ft. | # Of Holes: | 120 | | Interval Bottom: | 7584 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 84 |
| Total Gas Produced (MCF) | 2073 |
| GOR | 24678 |
| GOR Determination | MCFE |
| Average BOE per Day | 1.197 |
| Average MCFE per Day | 6.961 |
| Federal Financial Assurance | i | |
|
|