Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22809
Well Classification: GW Status: PA - 4/12/2023
Well Name/No:GEIST #2-4-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/12/2023
FacilityID:276694LocationID:336437
County:WELD #123Location:SWNW 32 3N67W 6
Field:WATTENBERG - #90750Elevation:4800 ft.
Planned Location:1553FNL  1193 FWLLat/Long: 40.185456 / -104.919264Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.185467 / -104.919018Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 3/14/2023             Measured TD: 8190 ft.    Vertical TD: 8013 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 3/14/2023
Wellbore PermitDIRECTIONAL
Permit #:20050524 Expiration Date:3/21/2006
Proposed Top PZ Location:Sec:32 Twp: 3N 67W Footage: 2534 FSL  1319 FWL
Bottom Hole Location:Sec:32 Twp: 3N 67W Footage: 2534 FSL  1319 FWL
Proposed Depth/Form:8034 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: W2

Wellbore Completed
Completion Date:4/11/2005
Spud Date:3/22/2005Spud Date Is:ACTUAL
Measured TD:8190 ft.Measured PB depth:8160 ft.
True Vertical TD:8013 ft.True Vertical PB depth:7983 ft.
Top PZ Location:Sec:32 Twp: 3N 67WFootage: 2534 FSL  1319 FWL
Bottom Hole Location:Sec:32 Twp: 3N 67WFootage: 2534 FSL  1319 FWL
Log Types:CBL, DUAL INDUCTION,COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 683 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 683 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8177 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 6420 ft., Bottom: 8177 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7164 ft.NN
CODELL7429 ft.NN
MOWRY7857 ft.NN
J SAND7872 ft.NN
DAKOTA8063 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 4/12/2023                 Interval Top: 7873 ft.    Interval Bottom: 7912 ft.

 Completed Information for Formation J SAND
1st Production Date:11/14/2005Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/11/2005
Treatment Summary:JSND COMPLETION FRAC'D THE J SAND (7873-7912') WITH 208,648 GAL FRAC FLUID AND 312,120 # SAND. 4/7/05 SET CBP@7815'. 4/10/05 DRILLED UP CBP@7815'. 4/11/05
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 131
BBLS_OIL 9
CALC_BBLS_H2O 131
CALC_BBLS_OIL 9
CALC_GOR 97000
CALC_MCF_GAS 873
CASING_PRESS 1548
MCF_GAS 873
TUBING_PRESS 1136
Perforation Data:
Interval Top:7873 ft.# Of Holes:79
Interval Bottom:7912 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/19/2022                Interval Top: 7430 ft.    Interval Bottom: 7450 ft.

 Completed Information for Formation CODELL
1st Production Date:11/14/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/11/2005
Treatment Summary:SET CIBP @ 7530'. 10-28-05. FRAC'D THE CODELL (7430' - 7450') WITH 137,088 GAL FRAC FLUID AND 300,560# SAND. 10-31-05.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 20
CALC_BBLS_H2O 0
CALC_BBLS_OIL 20
CALC_GOR 9250
CALC_MCF_GAS 185
CASING_PRESS 629
MCF_GAS 185
TUBING_PRESS 508
Perforation Data:
Interval Top:7430 ft.# Of Holes:80
Interval Bottom:7450 ft.Hole Size:0.42 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 12/1/2005                 Interval Top: 7430 ft.    Interval Bottom: 7912 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/11/2005
Treatment Summary:JSND-CDL COMMINGLE DRILLED OUT CIBP @ 7530' TO COMMINGLE THE JSND-CDL. 11/22/05 HOLE SIZE 0.38/0.42
Tubing Size:2.375 in.Tubing Setting Depth:7405 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 18
CASING_PRESS 1066
MCF_GAS 182
TUBING_PRESS 1005
Perforation Data:
Interval Top:7430 ft.# Of Holes:144
Interval Bottom:7912 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/4/2007                  Interval Top: 7210 ft.    Interval Bottom: 7912 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/11/2005
Treatment Summary:JNBCD COMMINGLE DRILLED OUT CIBP @ 7350' AND 7530' TO COMMINGLE THE JNBCD. 01/26/07
Tubing Size:2.375 in.Tubing Setting Depth:7857 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/4/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 15
CALC_BBLS_H2O 5
CALC_BBLS_OIL 15
CALC_GOR 34867
CALC_MCF_GAS 523
CASING_PRESS 737
MCF_GAS 523
TUBING_PRESS 407
Perforation Data:
Interval Top:7210 ft.# Of Holes:264
Interval Bottom:7912 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/12/2023                 Interval Top: 7210 ft.    Interval Bottom: 7450 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/14/2005Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/22/2010
Treatment Summary:NIOBRARA-FRAC'D WITH 141,414 GAL FRAC FLUID CONTAINING 250,700 # SAND; CODELL - FRAC'D WITH 121,002 GAL FRAC FLUID CONTAINING 250,180 # SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 31
BBLS_OIL 26
BTU_GAS 1251
CALC_BBLS_H2O 50
CALC_BBLS_OIL 39
CALC_GOR 11435
CALC_MCF_GAS 446
CASING_PRESS 500
GRAVITY_OIL 48
MCF_GAS 297
TUBING_PRESS 182
Perforation Data:
Interval Top:7210 ft.# Of Holes:200
Interval Bottom:7450 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/12/2023                 Interval Top: 7210 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/14/2005Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7210 ft.# Of Holes:120
Interval Bottom:7240 ft.Hole Size:0.73 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/12/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No