Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22756
Well Classification: OW Status: PA - 1/29/2026
Well Name/No:CLARK #11-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/29/2026
FacilityID:276280LocationID:305291
County:WELD #123Location:NWNW 27 7N65W 6
Field:WATTENBERG - #90750Elevation:4820 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:470FNL  862 FWLLat/Long: 40.552433 / -104.655719Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.552390 / -104.655780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 1/29/2026             Measured TD: 7355 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 1/29/2026
Wellbore Permit
Permit #:20050284 Expiration Date:2/24/2006
Proposed Depth/Form:8260 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKJNC , Formation: DAKOTA-J-NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8260 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 225, Top: 3760 ft., Bottom: 6760 ft.

Wellbore Completed
Completion Date:3/22/2005
Spud Date:3/5/2005Spud Date Is:ACTUAL
Measured TD:7355 ft.Measured PB depth:7343 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DENSITY,COMP. NEUTRON, DUAL INDUCTION, GAMMA RAY,CEMENT BOND LOG,CCL,VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 543 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 543 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7343 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 6436 ft., Bottom: 7343 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6436 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 3362 ft., Bottom: 6436 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND3105 ft.NN
PARKMAN3780 ft.NN
SUSSEX4246 ft.NN
SHANNON4526 ft.NN
NIOBRARA6885 ft.NN
FORT HAYS7146 ft.NN
CODELL7180 ft.NN
CARLILE7220 ft.NN
GREENHORN7255 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  AB - 1/29/2026                 Interval Top: 7183 ft.    Interval Bottom: 7193 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/22/2005
Treatment Summary:3/22/05 BJ SERVICES FRACED W/2576 BBL OF VISTAR 20# GEL SYSTEM USING 217200# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 35
BTU_GAS 1321
CALC_GOR 2057
CASING_PRESS 310
GRAVITY_OIL 44
MCF_GAS 72
TUBING_PRESS 300
Perforation Data:
Interval Top:7183 ft.# Of Holes:30
Interval Bottom:7193 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/29/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No