|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/19/2019 Measured TD: 7745 ft. Vertical TD: 7611 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/19/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20043320 | Expiration Date: | 1/23/2006 | | Proposed Top PZ Location: | Sec:17 Twp: 3N 66W | Footage: 1190 FSL 1440 FEL | | Bottom Hole Location: | Sec:17 Twp: 3N 66W | Footage: 1190 FSL 1440 FEL | | Proposed Depth/Form: | 7590 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE4 |
| | |
| Wellbore Completed | | Completion Date: | 2/17/2005 | | Spud Date: | 2/2/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 7745 ft. | Measured PB depth: | 7699 ft. | | True Vertical TD: | 7611 ft. | True Vertical PB depth: | 7565 ft. | | Top PZ Location: | Sec:17 Twp: 3N 66W | Footage: 1190 FSL 1440 FEL | | Bottom Hole Location: | Sec:17 Twp: 3N 66W | Footage: 1190 FSL 1440 FEL | | Log Types: | CBL, GR, CDCN, DIGL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 643 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 445, Top: 0 ft., Bottom: 643 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7730 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 650, Top: 3560 ft., Bottom: 7730 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4434 ft. | | N | N | | NIOBRARA | 7302 ft. | | N | N | | FORT HAYS | 7562 ft. | | N | N | | CODELL | 7584 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/3/2008 Interval Top: 7586 ft. Interval Bottom: 7602 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/17/2005 | | Treatment Summary: | 11/02/07 TEMPORARY SHUT-IN FOR NBRR RECOMPLETE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 9364 | | CALC_MCF_GAS | 206 | | CASING_PRESS | 407 | | GRAVITY_OIL | 56 | | MCF_GAS | 206 | | TUBING_PRESS | 343 |
| | Perforation Data: | | Interval Top: | 7586 ft. | # Of Holes: | | | Interval Bottom: | 7602 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/19/2019 Interval Top: 7318 ft. Interval Bottom: 7602 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/25/2008 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/22/2008 | | Treatment Summary: | DRILL OUT PLUG COMMINGLE NB-CD. CODL PERFS 2/16/05> 7586-7602 (4SPF) |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7556 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/3/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1219 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 17000 | | CALC_MCF_GAS | 136 | | CASING_PRESS | 450 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 350 |
| | Perforation Data: | | Interval Top: | 7318 ft. | # Of Holes: | 248 | | Interval Bottom: | 7602 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 12/17/2007 Interval Top: 7318 ft. Interval Bottom: 7448 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/15/2007 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/6/2007 | | Treatment Summary: | PERF NBRR> 7318-7328', 7360-7370', 7380-7390', 7391-7401', 7432-7448' (3 SPF FOR ALL). FRAC NBRR A&B W/245,000 GAL FLUID & 200,000# 30/50 SAND. FRAC NBRR C W/130,000 GAL FLUID & 100,000# 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/17/2007 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1219 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 11308 | | CALC_MCF_GAS | 147 | | CASING_PRESS | 825 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7318 ft. | # Of Holes: | 184 | | Interval Bottom: | 7448 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/19/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|