Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22659
Well Classification: OW Status: PA - 8/19/2024
Well Name/No:HOWARD #1-27
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/19/2024
FacilityID:275700LocationID:305214
County:WELD #123Location:NENE 27 1N67W 6
Field:WATTENBERG - #90750Elevation:5000 ft.
Planned Location:470FNL  760 FELLat/Long: 40.027968 / -104.870032Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.028082 / -104.869945Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/6/2011
End Date: 4/6/2011
Reported: 5/25/2011
Prior to rule 205A.b.(2)(A)
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/19/2024             Measured TD: 8295 ft.    Vertical TD: 8295 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/19/2024
Wellbore Permit
Permit #:20043291 Expiration Date:1/23/2006
Proposed Depth/Form:8273 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE4

Wellbore Completed
Completion Date:5/3/2005
Spud Date:4/12/2005Spud Date Is:ACTUAL
Measured TD:8295 ft.Measured PB depth:8270 ft.
True Vertical TD:8295 ft.True Vertical PB depth:8270 ft.
Log Types:CBL, GR, CDCN, DIGL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1076 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 755, Top: 0 ft., Bottom: 1076 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8285 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 6797 ft., Bottom: 8285 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5227 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4075 ft., Bottom: 5232 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4679 ft.NN
SHANNON4992 ft.NN
NIOBRARA7288 ft.NN
FORT HAYS7669 ft.NN
CODELL7690 ft.NN
J SAND8128 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 8/19/2024                 Interval Top: 8146 ft.    Interval Bottom: 8174 ft.

 Completed Information for Formation J SAND
1st Production Date:8/10/2005Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/23/2013Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/1/2011
Treatment Summary:SAND PLUG SET @ 7900
Formation Treatment
Treatment Date:5/3/2005
Treatment Summary:162903 GAL FLUID FRAC INFO REPRESENTS: JSND 4000 LBS 12/20 SAND 116280 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8146 ft.# Of Holes:100
Interval Bottom:8174 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OG                     Status:  CM - 5/2/2011                  Interval Top: 7692 ft.    Interval Bottom: 7714 ft.

 Completed Information for Formation CODELL
1st Production Date:4/12/2011Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2011
Treatment Summary:REPERF CDL (4/4/2011) 7694-7714 HOLES 40 SIZE .38 Re-Frac Codell down 4-1/2" Csg w/ 203,608 gal Slickwater w/ 150,680# 30/50, 4,000# SuperLC.
Formation Treatment
Treatment Date:5/3/2005
Treatment Summary:CODL 141536 GAL FLUID FRAC INFO REPRESENTS: CODL 115280 LBS 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 40
CALC_BBLS_OIL 40
CALC_GOR 1980
CALC_MCF_GAS 79
CASING_PRESS 789
GRAVITY_OIL 46
MCF_GAS 79
TUBING_PRESS 346
Perforation Data:
Interval Top:7692 ft.# Of Holes:66
Interval Bottom:7714 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 8/10/2005                 Interval Top: 7692 ft.    Interval Bottom: 8174 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.344 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/3/2005
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/10/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 17
CALC_BBLS_OIL 17
CALC_GOR 15420
CALC_MCF_GAS 262
CASING_PRESS 508
GRAVITY_OIL 49
MCF_GAS 262
TUBING_PRESS 215
Perforation Data:
Interval Top:7692 ft.# Of Holes:
Interval Bottom:8174 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 4/18/2013                 Interval Top: 7294 ft.    Interval Bottom: 8174 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:4/15/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:4/18/2013Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8114 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/18/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1284
CALC_MCF_GAS 42
CASING_PRESS 748
GRAVITY_OIL 49
MCF_GAS 42
TUBING_PRESS 548
Perforation Data:
Interval Top:7294 ft.# Of Holes:278
Interval Bottom:8174 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 8/19/2024                 Interval Top: 7294 ft.    Interval Bottom: 7714 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/12/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2011
Treatment Summary:CDRF-NBREC
Tubing Size:2.375 in.Tubing Setting Depth:7674 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/28/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1289
CALC_MCF_GAS 30
CASING_PRESS 1560
GRAVITY_OIL 48
MCF_GAS 30
TUBING_PRESS 991
Perforation Data:
Interval Top:7294 ft.# Of Holes:176
Interval Bottom:7714 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 6/10/2011                 Interval Top: 7294 ft.    Interval Bottom: 7555 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/12/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/6/2011
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 252 gal 15% HCl & 247,456 gal Slickwater w/ 200,960# 30/50, 4,000# SuperLC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7294 ft.# Of Holes:72
Interval Bottom:7555 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/19/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No