Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22588
Well Classification: GW Status: SI - 7/1/2021
Well Name/No:MOSER #4-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2021
FacilityID:274862LocationID:305166
County:WELD #123Location:NWNW 4 2N65W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:515FNL  621 FWLLat/Long: 40.173047 / -104.676047Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.173210 / -104.675970Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2021             Measured TD: 7827 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2021
Wellbore Permit
Permit #:20042618 Expiration Date:11/22/2005
Proposed Depth/Form:7808 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NW4

Wellbore Completed
Completion Date:N/A
Spud Date:12/16/2004Spud Date Is:ACTUAL
Measured TD:7827 ft.Measured PB depth:7796 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CN/LD/AI/ML/CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 849 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 660, Top: 0 ft., Bottom: 849 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7825 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 3700 ft., Bottom: 7825 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4534 ft.NN
NIOBRARA6928 ft.NN
FORT HAYS7191 ft.NN
CODELL7212 ft.NN
J SAND7672 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 7/1/2021                  Interval Top: 7674 ft.    Interval Bottom: 7730 ft.

 Completed Information for Formation J SAND
1st Production Date:12/12/2005Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/7/2011
Treatment Summary:Drill out sand plug, circulate clean to 7755' to commingle J Sand, Niobrara, Codell
Formation Treatment
Treatment Date:11/28/2005
Treatment Summary:SAND PLUG @ 7550'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7674 ft.# Of Holes:80
Interval Bottom:7730 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/10/2009                 Interval Top: 7215 ft.    Interval Bottom: 7228 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2006
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 26
CALC_BBLS_H2O 0
CALC_BBLS_OIL 26
CALC_GOR 8769
CALC_MCF_GAS 228
CASING_PRESS 543
GRAVITY_OIL 50
MCF_GAS 228
TUBING_PRESS 228
Perforation Data:
Interval Top:7215 ft.# Of Holes:52
Interval Bottom:7228 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 3/3/2006                  Interval Top: 7215 ft.    Interval Bottom: 7730 ft.

 Completed Information for Formation J-CODELL
1st Production Date:12/12/2005Choke Size:0.047 in.
Formation Name:J-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/12/2005
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7658 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/3/2006Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 6
CALC_BBLS_H2O 0
CALC_BBLS_OIL 6
CALC_GOR 26833
CALC_MCF_GAS 161
CASING_PRESS 518
GRAVITY_OIL 52
MCF_GAS 161
TUBING_PRESS 321
Perforation Data:
Interval Top:7215 ft.# Of Holes:136
Interval Bottom:7730 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 1/23/2011                 Interval Top: 6928 ft.    Interval Bottom: 7730 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/26/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/7/2011
Treatment Summary:Drill out sand plug to commingle J Sand, Niobrara, Codell No choke
Tubing Size:2.375 in.Tubing Setting Depth:7625 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/23/2011Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 4
BTU_GAS 1295
CALC_BBLS_OIL 4
CALC_GOR 15000
CALC_MCF_GAS 60
CASING_PRESS 229
GRAVITY_OIL 53
MCF_GAS 60
TUBING_PRESS 203
Perforation Data:
Interval Top:6928 ft.# Of Holes:248
Interval Bottom:7730 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 7/1/2019                  Interval Top: 6928 ft.    Interval Bottom: 7228 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/2/2009Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/3/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1224
CALC_BBLS_OIL 36
CALC_GOR 1722
CALC_MCF_GAS 62
CASING_PRESS 950
GRAVITY_OIL 51
TUBING_PRESS 650
Perforation Data:
Interval Top:6928 ft.# Of Holes:168
Interval Bottom:7228 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/10/2009                 Interval Top: 6928 ft.    Interval Bottom: 7084 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/30/2008
Treatment Summary:PERF INTERVALS: NIO. A 6928-6932, B 6970-6990, C 7064-7084. FRAC NIO C WITH 138467 GALS FLUID, 100430 40/70. FRAC NIO A AND B WITH 214028 GALS FLUID, 157690# 40/70, AND 4000 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6928 ft.# Of Holes:116
Interval Bottom:7084 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
06/30/2021
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No