Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22558
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:STROH N #35-23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:274702LocationID:305146
Municipality/County:MILLIKEN / WELD #123Location:W2SE 35 5N67W 6
Field:WATTENBERG - #90750Elevation:4869 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1322FSL  1395 FELLat/Long: 40.352514 / -104.855864Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.352460 / -104.855930Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 7950 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDRIFTED
Permit #:20042523 Expiration Date:11/21/2005
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:4/8/2005
Spud Date:3/3/2005Spud Date Is:ACTUAL
Measured TD:7950 ft.Measured PB depth:7908 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION,GR, SP, CNL/CDL, MICROLOG, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 417 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 417 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7923 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 6486 ft., Bottom: 7923 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5143 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 4190 ft., Bottom: 5143 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4300 ft.NN
SHANNON4782 ft.NN
NIOBRARA7006 ft.NN
FORT HAYS7325 ft.NN
CODELL7346 ft.NN
J SAND7799 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 7347 ft.    Interval Bottom: 7364 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:4/8/2005
Treatment Summary:FRAC'D CODELL W/128,889 GAL VISTAR 22/20# GEL & 270,560# 20/40 SAND, 4/5/05.
Tubing Size:2.375 in.Tubing Setting Depth:7317 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2005Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 28
BTU_GAS 1282
CALC_BBLS_H2O 3
CALC_BBLS_OIL 28
CALC_GOR 7214
CALC_MCF_GAS 202
CASING_PRESS 920
GRAVITY_OIL 58
MCF_GAS 202
TUBING_PRESS 420
Perforation Data:
Interval Top:7347 ft.# Of Holes:68
Interval Bottom:7364 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY11/20/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)91
Total Gas Produced (MCF)1290
GOR14175
GOR DeterminationBOE
Average BOE per Day0.859
Average MCFE per Day4.991

 Federal Financial Assurance  i 

 Tribal Well  i No