|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2022 Measured TD: 6925 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2022 | | Wellbore Permit | | | Permit #: | 20042487 | Expiration Date: | 11/8/2005 | | Proposed Depth/Form: | 6950 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318 , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 12/28/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 6925 ft. | Measured PB depth: | 6925 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CD / CN / GR / DI /GL / CB | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 590 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 590 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6935 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 5838 ft., Bottom: 6935 ft., Determination Method: CBL |
Formation JSND Formation Classification: OW Status: PR - 4/1/2022 Interval Top: 6813 ft. Interval Bottom: 6818 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/1/2005 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/1/2005 | | Treatment Summary: | FRAC W/6800# 20/40 SAND & 129 BBLS GELLED H2O |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6849 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/1/2005 | Test Method: | PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 3 | | GRAVITY_OIL | 38 |
| | Perforation Data: | | Interval Top: | 6813 ft. | # Of Holes: | 20 | | Interval Bottom: | 6818 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 28 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.077 |
| Average MCFE per Day | 0.453 |
| Federal Financial Assurance | i | |
|
|