|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/3/2024 Measured TD: 8016 ft. Vertical TD: 8016 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/3/2024 | Wellbore Permit | | Permit #: | 20042285 | Expiration Date: | 10/20/2005 | Proposed Depth/Form: | 8015 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SE4 |
| | |
Wellbore Completed | Completion Date: | 4/19/2005 | Spud Date: | 3/30/2005 | Spud Date Is: | ACTUAL | Measured TD: | 8016 ft. | Measured PB depth: | 7985 ft. | True Vertical TD: | 8016 ft. | True Vertical PB depth: | 7985 ft. | Log Types: | CBL, CNLD, DIGL, GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 889 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 640, Top: 0 ft., Bottom: 889 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7998 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 960, Top: 4228 ft., Bottom: 7998 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 4228 ft., Bottom: 5568 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4385 ft. | | N | N | SHANNON | 4941 ft. | | N | N | NIOBRARA | 7158 ft. | | N | N | FORT HAYS | 7397 ft. | | N | N | CODELL | 7419 ft. | | N | N | J SAND | 7859 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/3/2024 Interval Top: 7856 ft. Interval Bottom: 7900 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/14/2006 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/8/2006 | Treatment Summary: | 153,552 GALS FLUID & 117,640 LBS 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7856 ft. | # Of Holes: | 88 | Interval Bottom: | 7900 ft. | Hole Size: | 0.45 in. |
|
Formation CODL Formation Classification: GW Status: AB - 7/3/2024 Interval Top: 7421 ft. Interval Bottom: 7438 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | 0.219 in. | Formation Name: | CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/19/2005 | Treatment Summary: | CODELL 151432 GAL FLUID 120100 LBS 30/50 SAND FRAC INFO REPRESENTS: CODELL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7383 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/16/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 44 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 44 | CALC_GOR | 1410 | CALC_MCF_GAS | 62 | CASING_PRESS | 1327 | GRAVITY_OIL | 48 | MCF_GAS | 62 | TUBING_PRESS | 1081 |
| Perforation Data: | Interval Top: | 7421 ft. | # Of Holes: | 51 | Interval Bottom: | 7438 ft. | Hole Size: | 0.45 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/2/2006 Interval Top: 7421 ft. Interval Bottom: 7900 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 3/14/2006 | Choke Size: | 0.313 in. | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/19/2005 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7824 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/2/2006 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 9 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 9 | CALC_GOR | 43780 | CALC_MCF_GAS | 394 | CASING_PRESS | 841 | GRAVITY_OIL | 47 | MCF_GAS | 394 | TUBING_PRESS | 630 |
| Perforation Data: | Interval Top: | 7421 ft. | # Of Holes: | 139 | Interval Bottom: | 7900 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
Reported Plugged | Y | 07/03/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|