|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/27/2025 Measured TD: 7990 ft. Vertical TD: 7918 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/27/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20053937 | Expiration Date: | 11/21/2006 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 520 FSL 2134 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 501 FSL 2154 FEL | | Proposed Depth/Form: | 7990 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 838 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 838 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7989 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 570, Top: 3280 ft., Bottom: 7989 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/10/2004 | | Spud Date: | 10/23/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7990 ft. | Measured PB depth: | 7973 ft. | | True Vertical TD: | 7918 ft. | True Vertical PB depth: | 7901 ft. | | Top PZ Location: | Sec: Twp: | Footage: 520 FSL 2134 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 501 FSL 2154 FEL | | Log Types: | CDL-CNL-IDL-MICRO-CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 841 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 841 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7986 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 570, Top: 3210 ft., Bottom: 7986 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4242 ft. | | N | N | | SHANNON | 4816 ft. | | N | N | | NIOBRARA | 7103 ft. | | N | N | | FORT HAYS | 7341 ft. | | N | N | | CODELL | 7367 ft. | | N | N | | J SAND | 7808 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 3/27/2025 Interval Top: 7810 ft. Interval Bottom: 7880 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/5/2006 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/22/2005 | | Treatment Summary: | 161,701 GALS FLUID & 117,600 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7810 ft. | # Of Holes: | 126 | | Interval Bottom: | 7880 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 3/16/2006 Interval Top: 7108 ft. Interval Bottom: 7880 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/5/2006 | Choke Size: | 0.344 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/10/2004 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7763 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/16/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 66720 | | CALC_MCF_GAS | 467 | | CASING_PRESS | 626 | | GRAVITY_OIL | 48 | | MCF_GAS | 467 | | TUBING_PRESS | 495 |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 184 | | Interval Bottom: | 7880 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/27/2025 Interval Top: 7108 ft. Interval Bottom: 7386 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 20.000 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/10/2004 | | Treatment Summary: | CODELL-NIOBRARA 500 GAL FLUID FRAC INFO REPRESENTS; CODELL-NIOBRARA, 147541 GAL FLUID 189000 LBS 20/40 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7327 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/3/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 20 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 5950 | | CALC_MCF_GAS | 119 | | CASING_PRESS | 860 | | GRAVITY_OIL | 48 | | MCF_GAS | 119 | | TUBING_PRESS | 644 |
| | Perforation Data: | | Interval Top: | 7108 ft. | # Of Holes: | 62 | | Interval Bottom: | 7386 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/27/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|