Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22401
Well Classification: OW Status: PA - 5/16/2019
Well Name/No:BERRY #24-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/16/2019
FacilityID:273757LocationID:332509
County:WELD #123Location:SWNE 8 3N67W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2450FNL  1420 FELLat/Long: 40.240965 / -104.909995Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.240925 / -104.909892Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/16/2019             Measured TD: 7295 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/16/2019
Wellbore Permit
Permit #:20041991 Expiration Date:9/20/2005
Proposed Depth/Form:7290 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: S2NE4

Wellbore Completed
Completion Date:10/15/2004
Spud Date:9/26/2004Spud Date Is:ACTUAL
Measured TD:7295 ft.Measured PB depth:7221 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGL/GR, CDCN/GR, CBL/GR
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 676 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 0 ft., Bottom: 676 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7290 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 2890 ft., Bottom: 7290 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1000 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 322 ft., Bottom: 1013 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 322 ft., Depth: 1000 ft., Bottom: 1013 ft., Sacks: 140, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
SUSSEX4102 ft.NN
SHANNON4516 ft.NN
NIOBRARA6846 ft.NN
FORT HAYS7104 ft.NN
CODELL7126 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/14/2010                 Interval Top: 7128 ft.    Interval Bottom: 7148 ft.

 Completed Information for Formation CODELL
1st Production Date:11/11/2004Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2010
Treatment Summary:RELEASED RBP @ 7056 04/12/2010 TO COMMINGLE WITH NB PRODUCTION ON 04/26/2010.
Formation Treatment
Treatment Date:3/3/2010
Treatment Summary:SEE RBP @ 7056 OUR INTENT IS TO REMOVE THE RBP TO COMMINGLE WELL IN THE NEXT SIX MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 30
CALC_BBLS_H2O 0
CALC_BBLS_OIL 30
CALC_GOR 4500
CALC_MCF_GAS 135
CASING_PRESS 598
GRAVITY_OIL 50
MCF_GAS 135
TUBING_PRESS 528
Perforation Data:
Interval Top:7128 ft.# Of Holes:60
Interval Bottom:7148 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/16/2019                 Interval Top: 6862 ft.    Interval Bottom: 7148 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/26/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/2010
Treatment Summary:RELEASED RBP 04/12/2010 TO COMMINGLE NB/CD PRODUCTION ON 04/26/2010.
Tubing Size:2.375 in.Tubing Setting Depth:7104 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1346
CALC_BBLS_OIL 12
CALC_GOR 7000
CALC_MCF_GAS 84
CASING_PRESS 1500
GRAVITY_OIL 48
TUBING_PRESS 1500
Perforation Data:
Interval Top:6862 ft.# Of Holes:138
Interval Bottom:7148 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/14/2010                 Interval Top: 6862 ft.    Interval Bottom: 7002 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/18/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/26/2010
Treatment Summary:NO ADDITIONAL TREATMENT. COMMINGLED WITH CD PRODUCTION 04/26/2010.
Formation Treatment
Treatment Date:3/12/2010
Treatment Summary:FRAC NBRR W/500 GAL 15% HCL & 246,806# GAL SW * 201060# 40/70 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BTU_GAS 1337
CALC_BBLS_H2O 0
CALC_BBLS_OIL 40
CALC_GOR 3900
CALC_MCF_GAS 156
CASING_PRESS 250
GRAVITY_OIL 49
TUBING_PRESS 0
Perforation Data:
Interval Top:6862 ft.# Of Holes:78
Interval Bottom:7002 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/16/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No