Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22376
Well Classification: OW Status: PA - 7/24/2024
Well Name/No:CECIL #11-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/24/2024
FacilityID:273560LocationID:332493
County:WELD #123Location:NWNW 12 6N64W 6
Field:WATTENBERG - #90750Elevation:4715 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:848FNL  482 FWLLat/Long: 40.505674 / -104.506074Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.505640 / -104.506080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/24/2024             Measured TD: 7111 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/24/2024
Wellbore PermitDRIFTED
Permit #:20041746 Expiration Date:9/1/2005
Proposed Depth/Form:8055 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NW4
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8055 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 3555 ft., Bottom: 6555 ft.

Wellbore Completed
Completion Date:12/23/2004
Spud Date:12/5/2004Spud Date Is:ACTUAL
Measured TD:7111 ft.Measured PB depth:7067 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMPENSATED DEN,COMP.NEU,DUAL IND,GR,CMT CBL,CCL,VDL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 855 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 865 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7067 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 507, Top: 3410 ft., Bottom: 7067 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3410 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 1166 ft., Bottom: 3410 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2930 ft.NN
PARKMAN3571 ft.NN
SUSSEX3990 ft.NN
SHANNON4240 ft.NN
NIOBRARA6610 ft.NN
FORT HAYS6806 ft.NN
CODELL6898 ft.NN
CARLILE6914 ft.NN
GREENHORN6944 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/12/2024                 Interval Top: 6900 ft.    Interval Bottom: 6910 ft.

 Completed Information for Formation CODELL
1st Production Date:3/10/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/23/2004
Treatment Summary:12/23/04 B J SERVICES FRACED WITH 2556 BBL OF VISTAR 20# GEL SYSTEM USING 217820# OF 20/40 FRAC SAND AND 8000# OF RESIN COATED SUPER LC 20/40 MESH SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 83
BTU_GAS 1385
CALC_GOR 2166
CASING_PRESS 600
GRAVITY_OIL 44
MCF_GAS 60
TUBING_PRESS 550
Perforation Data:
Interval Top:6900 ft.# Of Holes:54
Interval Bottom:6910 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/24/2024                 Interval Top: 6618 ft.    Interval Bottom: 6910 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/9/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6618 ft.# Of Holes:82
Interval Bottom:6910 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/20/2024                 Interval Top: 6618 ft.    Interval Bottom: 6748 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/9/2011Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6618 ft.# Of Holes:28
Interval Bottom:6748 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/24/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No