|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/7/2024 Measured TD: 7291 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/7/2024 | | Wellbore Permit | | | Permit #: | 20041755 | Expiration Date: | 8/26/2005 | | Proposed Depth/Form: | 8255 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DK-J , Formation: DAKOTA-JSND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2/SE | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 8255 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 3755 ft., Bottom: 6755 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/22/2004 | | Spud Date: | 9/17/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7291 ft. | Measured PB depth: | 7288 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 449 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 449 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7288 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 155, Top: 5540 ft., Bottom: 7288 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5540 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 2184 ft., Bottom: 5540 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 2184 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 202, Top: 0 ft., Bottom: 2184 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2810 ft. | | N | N | | PARKMAN | 3752 ft. | | N | N | | SUSSEX | 4095 ft. | | N | N | | SHANNON | 4500 ft. | | N | N | | NIOBRARA | 6786 ft. | | N | N | | FORT HAYS | 7007 ft. | | N | N | | CODELL | 7056 ft. | | N | N | | CARLILE | 7073 ft. | | N | N | | GREENHORN | 7122 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/4/2011 Interval Top: 7056 ft. Interval Bottom: 7068 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/26/2011 | | Treatment Summary: | RePerf'd Codell 7056-64' (24 new holes) (Original perfs 7058-68, 24 holes)
Re-Frac'd Codell w/ 596 bbls of 26# pHaser pad, 1980 bbls of 26# pHaser, 217740# 20/40 Preferd Rock, 8000 lbs of AcFrac 20/40 SB Excel. | | Formation Treatment | | Treatment Date: | 10/12/2004 | | Treatment Summary: | 10/12/04 BJ SERVICES FRACED WITH 2673 BBL OF 20 # VISTAR GEL, 217,560# OF 20/40 MESH SAND AND 8,000# OF 20/40 SUPER LC RESIN SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 30 | | BTU_GAS | 1305 | | CALC_GOR | 2000 | | CASING_PRESS | 550 | | GRAVITY_OIL | 42 | | MCF_GAS | 60 | | TUBING_PRESS | 525 |
| | Perforation Data: | | Interval Top: | 7056 ft. | # Of Holes: | 48 | | Interval Bottom: | 7068 ft. | Hole Size: | 0.34 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/7/2024 Interval Top: 6792 ft. Interval Bottom: 7068 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/2/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7032 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/5/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 29 | | BTU_GAS | 1360 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 2586 | | CALC_MCF_GAS | 75 | | CASING_PRESS | 800 | | GRAVITY_OIL | 44 | | MCF_GAS | 75 | | TUBING_PRESS | 325 |
| | Perforation Data: | | Interval Top: | 6792 ft. | # Of Holes: | 76 | | Interval Bottom: | 7068 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 6/17/2011 Interval Top: 6792 ft. Interval Bottom: 6948 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2011 | | Treatment Summary: | Perf'd Niobrara "A" 6792'-94' (4 holes), Niobrara "C" 6936'-40' and 6944'-48'' (24 holes)
ReFrac'd Niobrara with 1548 bbls of Slickwater pad, 143 bbls of pHaser 22# pad, 2133 bbls of pHaser 22# fluid system and 218560 lbs of 30/50 white sand, 12000 # 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6792 ft. | # Of Holes: | 28 | | Interval Bottom: | 6948 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/07/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|