Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22238
Well Classification: OW Status: PA - 7/31/2025
Well Name/No:FREDERICKS #13-27X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/31/2025
FacilityID:272455LocationID:409791
Municipality/County:FREDERICK / WELD #123Location:SWSW 27 2N68W 6
Field:WATTENBERG - #90750Elevation:5010 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:555FSL  493 FWLLat/Long: 40.103847 / -104.997146Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.103794 / -104.997047Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/3/2011
End Date: 8/3/2011
Reported: 8/22/2011
Prior to rule 205A.b.(2)(A)
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/1/2022             Measured TD: 8265 ft.    Vertical TD: 8243 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/1/2022
Wellbore Permit
Permit #:Expiration Date:5/26/2005
Proposed Depth/Form:7830 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 800 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 560, Top: 0 ft., Bottom: 800 ft.

Wellbore Completed
Completion Date:3/28/2005
Spud Date:2/24/2005Spud Date Is:ACTUAL
Measured TD:8265 ft.Measured PB depth:8225 ft.
True Vertical TD:8243 ft.True Vertical PB depth:8203 ft.
Top PZ Location:Sec: Twp: Footage: 833 FSL  580 FWL
Bottom Hole Location:Sec: Twp: Footage: 841 FSL  582 FWL
Log Types:CBL, CNLD (2), MRL, ML, AILC (2), CVL,
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 855 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 855 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8255 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 4394 ft., Bottom: 8255 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7418 ft.NN
FORT HAYS7651 ft.NN
CODELL7674 ft.NN
J SAND8098 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 3/2/2005                  Interval Top: 8098 ft.    Interval Bottom: 8136 ft.

 Completed Information for Formation J SAND
1st Production Date:1/5/2006Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8098 ft.# Of Holes:90
Interval Bottom:8136 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/11/2011                Interval Top: 7674 ft.    Interval Bottom: 7693 ft.

 Completed Information for Formation CODELL
1st Production Date:4/29/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2011
Treatment Summary:Re-Frac Codell down 4-1/2" Csg w/ 215,296 gal Slickwater w/ 150,180# 40/70, 4,000# SB Excel.
Formation Treatment
Treatment Date:3/28/2005
Treatment Summary:CODELL: 144480 GAL FLUID 115080 LBS 30/50 SAND FRAC INFO REPRESENTS: CODELL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 84
CALC_BBLS_H2O 0
CALC_BBLS_OIL 84
CALC_GOR 3060
CALC_MCF_GAS 257
CASING_PRESS 796
GRAVITY_OIL 49
MCF_GAS 257
TUBING_PRESS 424
Perforation Data:
Interval Top:7674 ft.# Of Holes:57
Interval Bottom:7693 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 3/2/2005                  Interval Top: 7574 ft.    Interval Bottom: 7693 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/29/2005Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 25
BTU_GAS 1245
CALC_BBLS_OIL 25
CALC_GOR 3240
CALC_MCF_GAS 81
CASING_PRESS 1024
GRAVITY_OIL 50
MCF_GAS 81
TUBING_PRESS 862
Perforation Data:
Interval Top:7574 ft.# Of Holes:113
Interval Bottom:7693 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 9/9/2011                  Interval Top: 7436 ft.    Interval Bottom: 7580 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/22/2011Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/27/2011
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 31,332 gal Slickwater.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7436 ft.# Of Holes:56
Interval Bottom:7580 ft.Hole Size:0.42 in.

Sidetrack #01             Wellbore Classification:              Status: AB - 7/31/2025             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         AB - 7/31/2025
Wellbore PermitDIRECTIONAL
Permit #:20050710 Expiration Date:3/2/2006
Proposed Top PZ Location:Sec:27 Twp: 2N 68W Footage: 580 FWL  830 FSL
Bottom Hole Location:Sec:27 Twp: 2N 68W Footage: 580 FWL  830 FSL
Proposed Depth/Form:8006 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2SW
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 855 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 599, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8006 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: , Bottom: 8006 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:2/24/2005Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:27 Twp: 2N 68WFootage: 830 FSL  580 FWL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 855 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 855 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8255 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 4361 ft., Bottom: 8255 ft., Determination Method: CBL

Formation JSND                     Formation Classification:  GW                     Status:  AB - 7/31/2025                 Interval Top: 8098 ft.    Interval Bottom: 8136 ft.

 Completed Information for Formation J SAND
1st Production Date:2/7/2006Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/31/2006
Treatment Summary:17,136 GALS FLUID & 89,980 LBS 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8098 ft.# Of Holes:80
Interval Bottom:8136 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/31/2011                Interval Top: 7674 ft.    Interval Bottom: 7693 ft.

 Completed Information for Formation CODELL
1st Production Date:4/29/2005Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2011
Treatment Summary:Re-Frac Codell down 4-1/2" Csg w/ 215,296 gal Slickwater w/ 150,180# 40/70, 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
CALC_BBLS_OIL 84
CALC_GOR 3060
CALC_MCF_GAS 257
CASING_PRESS 796
GRAVITY_OIL 49
TUBING_PRESS 424
Perforation Data:
Interval Top:7674 ft.# Of Holes:57
Interval Bottom:7693 ft.Hole Size:0.42 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 4/6/2006                  Interval Top: 7674 ft.    Interval Bottom: 8136 ft.

 Completed Information for Formation J-CODELL
1st Production Date:2/7/2006Choke Size:0.313 in.
Formation Name:J-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/7/2006
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8077 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/6/2006Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 6
CALC_BBLS_H2O 0
CALC_BBLS_OIL 6
CALC_GOR 16170
CALC_MCF_GAS 97
CASING_PRESS 535
GRAVITY_OIL 48
MCF_GAS 97
TUBING_PRESS 458
Perforation Data:
Interval Top:7674 ft.# Of Holes:87
Interval Bottom:8136 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/31/2025                 Interval Top: 7574 ft.    Interval Bottom: 7693 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/22/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2011
Treatment Summary:CDRF-NBRC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 25
BTU_GAS 1245
CALC_BBLS_OIL 25
CALC_GOR 3240
CALC_MCF_GAS 81
CASING_PRESS 1024
GRAVITY_OIL 50
MCF_GAS 81
TUBING_PRESS 862
Perforation Data:
Interval Top:7574 ft.# Of Holes:113
Interval Bottom:7693 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 10/28/2011                Interval Top: 7436 ft.    Interval Bottom: 7580 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/22/2011Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/27/2011
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 250 gal 15% HCl & 31,332 gal Slickwater.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7436 ft.# Of Holes:56
Interval Bottom:7580 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/31/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No