|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2025 Measured TD: 7255 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2025 | | Wellbore Permit | | | Permit #: | 20040598 | Expiration Date: | 4/5/2005 | | Proposed Depth/Form: | 7100 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-6 , Unit Acreage: 80, Drill Unit: W/2 |
| | |
| Wellbore Completed | | Completion Date: | 11/11/2004 | | Spud Date: | 10/7/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7255 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CBL/CNL/DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 394 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 0 ft., Bottom: 394 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7238 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 630, Top: 0 ft., Bottom: 7238 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3720 ft. | | N | N | | SUSSEX | 4450 ft. | | N | N | | NIOBRARA | 6798 ft. | | N | N | | CODELL | 7099 ft. | | N | N |
Formation NB-CD Formation Classification: GW Status: SI - 11/1/2024 Interval Top: 6800 ft. Interval Bottom: 7118 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/11/2004 | | Treatment Summary: | FRAC CODL (7100-7118') W/139,499 GALS FRAC FLUID + 263,840# 20/40 SAND & 12,000# ACFRAC 12/20# SAND. FRAC NB (6800-6992') W/176,626 GALS FRAC FLUID + 238,240# 20/40 SAND & 12,000# ACFRAC 12/20# SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6792 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2004 | Test Method: | | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 39 | | CALC_GOR | 1230 | | CASING_PRESS | 480 | | MCF_GAS | 48 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 6800 ft. | # Of Holes: | 232 | | Interval Bottom: | 7118 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive
|
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|