Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22070
Well Classification: OW Status: PA - 7/10/2024
Well Name/No:BOYLE STATE #8-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/10/2024
FacilityID:271502LocationID:332274
County:WELD #123Location:SENE 16 2N66W 6
Field:WATTENBERG - #90750Elevation:4949 ft.
Planned Location:1980FNL  660 FELLat/Long: 40.139827 / -104.775100Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.139950 / -104.775118Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 7/10/2024             Measured TD: 7622 ft.    Vertical TD: 7622 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 7/10/2024
Wellbore Permit
Permit #:20040355 Expiration Date:3/9/2005
Proposed Depth/Form:7600 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2NE

Wellbore Completed
Completion Date:4/6/2004
Spud Date:3/19/2004Spud Date Is:ACTUAL
Measured TD:7622 ft.Measured PB depth:7587 ft.
True Vertical TD:7622 ft.True Vertical PB depth:7587 ft.
Log Types:CNLD, AIL, GR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 859 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 859 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7603 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 4024 ft., Bottom: 7603 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4479 ft.NN
NIOBRARA7184 ft.NN
FORT HAYS7436 ft.NN
CODELL7457 ft.NN

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/10/2024                 Interval Top: 7233 ft.    Interval Bottom: 7476 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/18/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/9/2010
Treatment Summary:NBRR Perf 7233-7322 Holes 82 Size 0.32 CODL Perf 7458-7476 Holes 54 Size 0.32 Reperf NBRR 7240-7322 Holes 36 Size 0.32. Reperf CODL 7458-7476 Holes 18 Size 0.32. Refrac NB-CD w/ 448,644 gal SW & 342,520# 40/70 sand & 8,040# SB Excel.
Formation Treatment
Treatment Date:4/6/2004
Treatment Summary:500 GAL FLUID; 145,258 GAL FLUID; 116,180# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 17
BTU_GAS 1282
CALC_BBLS_OIL 17
CALC_GOR 3471
CALC_MCF_GAS 59
CASING_PRESS 835
GRAVITY_OIL 49
MCF_GAS 59
TUBING_PRESS 493
Perforation Data:
Interval Top:7233 ft.# Of Holes:136
Interval Bottom:7476 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/10/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No