|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 10/1/2025 Measured TD: 7554 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 10/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20040328 | Expiration Date: | 3/4/2005 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1366 FSL 1905 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 1366 FSL 1905 FWL | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: GRRS , Formation: GRANEROS , Order: , Unit Acreage: 160, Drill Unit: SW/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 |
| | |
| Wellbore Completed | | Completion Date: | 6/21/2004 | | Spud Date: | 4/21/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7554 ft. | Measured PB depth: | 7527 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 1366 FSL 1905 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 1366 FSL 1905 FWL | | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON, DIR. SURVEY, MCFL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 624 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 248, Top: 0 ft., Bottom: 624 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7543 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 6500 ft., Bottom: 7543 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4878 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 3730 ft., Bottom: 4878 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6940 ft. | | N | N | | FORT HAYS | 7199 ft. | | N | N | | CODELL | 7222 ft. | | N | N | | CARLILE | 7239 ft. | | N | N | | GREENHORN | 7281 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 1/1/2005 Interval Top: 6962 ft. Interval Bottom: 7238 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/21/2004 | | Treatment Summary: | FRAC CODL 7224-7238' W/131,000 GAL FRAC FLUID & 301,420 SAND. 6/1/04 SET RBP @7190'. 6/21/04 FRAC NBRR 6962-6992' W/133,300 GAL FLUID & 182,900# 20/40 SAND. 6/22/04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/2004 | Test Method: | FLOWING | | Hours Tested: | 17 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 66 | | BBLS_OIL | 19 | | CALC_BBLS_H2O | 66 | | CALC_BBLS_OIL | 97 | | CALC_GOR | 16053 | | CALC_MCF_GAS | 305 | | CASING_PRESS | 418 | | MCF_GAS | 305 |
| | Perforation Data: | | Interval Top: | 6962 ft. | # Of Holes: | 116 | | Interval Bottom: | 7238 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 10/1/2025 Interval Top: 6962 ft. Interval Bottom: 7238 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2009 | | Treatment Summary: | NB-CD REFRAC. RE-FRAC'D CODL W/ 139,372# 20/40 IN 118,188 GALS TOTAL FRAC FLUID. 12/11/09. TOTAL FRAC FLUID 146,202 GALS. 12/29/09. SET RBP @7206'. 12/15/09. REFRACD NBRR W/250,620# 20/40 SND IN 101,262 GALS VISTAR 24-26 XLF. ** SEE NEXT PAGE. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 20 | | BTU_GAS | 1245 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 15900 | | CALC_MCF_GAS | 318 | | CASING_PRESS | 752 | | GRAVITY_OIL | 62 | | MCF_GAS | 318 | | TUBING_PRESS | 362 |
| | Perforation Data: | | Interval Top: | 6962 ft. | # Of Holes: | 116 | | Interval Bottom: | 7238 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 432 |
| Total Gas Produced (MCF) | 9851 |
| GOR | 22803 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.872 |
| Average MCFE per Day | 34.048 |
| Federal Financial Assurance | i | |
|
|