|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 5/25/2023 Measured TD: 7452 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 5/25/2023 | | Wellbore Permit | DRIFTED | | Permit #: | 20040266 | Expiration Date: | 2/26/2005 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2SW | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: NA , Unit Acreage: 80, Drill Unit: W/2SW | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW |
| | |
| Wellbore Completed | | Completion Date: | 4/4/2004 | | Spud Date: | 3/24/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7452 ft. | Measured PB depth: | 7420 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 640 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 640 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7452 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 165, Top: 6426 ft., Bottom: 7452 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4760 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 256, Top: 3862 ft., Bottom: 4760 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6854 ft. | | N | N | | FORT HAYS | 7112 ft. | | N | N | | CODELL | 7136 ft. | | N | N | | CARLILE | 7153 ft. | | N | N | | GREENHORN | 7196 ft. | | N | N |
Formation GRNHN Formation Classification: GW Status: AB - 5/25/2023 Interval Top: 7340 ft. Interval Bottom: 7370 ft.| Completed Information for Formation GREENHORN | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | GREENHORN | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/25/2017 | Treatment End Date: | N/A | | Treatment Summary: | RBP @ 6684' WAS DRILLED OUT ON 3/29/2014. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 4/4/2004 | | Treatment Summary: | FRAC'D THE GREENHORN W/ 132,800 GALS FRAC FLUID AND 301,000# 20/40 FRAC SAND, 1 PPG THRU 4 PPG; 04-08-2004 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation GRNHN. |
| | Perforation Data: | | Interval Top: | 7340 ft. | # Of Holes: | 60 | | Interval Bottom: | 7370 ft. | Hole Size: | 0.34 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/25/2023 Interval Top: 7136 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 5/25/2023 Interval Top: 6876 ft. Interval Bottom: 7152 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/25/2017 | Treatment End Date: | N/A | | Treatment Summary: | RBP @ 6684' WAS DRILLED OUT ON 3/29/2014. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 2/5/2010 | | Treatment Summary: | NIOBRARA-FRAC'D WITH 135,450 GAL FRAC FLUID CONTAINING 250,380# SAND; CODELL - FRAC'D WITH 120,372 GAL FRAC FLUID CONTAINING 250,040 # SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 15 | | BTU_GAS | 1305 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 22400 | | CALC_MCF_GAS | 336 | | CASING_PRESS | 363 | | MCF_GAS | 336 | | TUBING_PRESS | 254 |
| | Perforation Data: | | Interval Top: | 6876 ft. | # Of Holes: | 120 | | Interval Bottom: | 7152 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 5/25/2023 Interval Top: 6854 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation GRNNC Formation Classification: GW Status: CM - 5/25/2023| Completed Information for Formation GREENHORN-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | GREENHORN-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/4/2004 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 32 | | BBLS_OIL | 43 | | CALC_BBLS_H2O | 32 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 17605 | | CALC_MCF_GAS | 757 | | CASING_PRESS | 450 | | MCF_GAS | 757 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/25/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|