Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22036
Well Classification: GW Status: SI - 4/1/2022
Well Name/No:MOSER #11-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2022
FacilityID:271386LocationID:332250
County:WELD #123Location:NESW 4 2N65W 6
Field:WATTENBERG - #90750Elevation:4860 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1900FSL  2155 FWLLat/Long: 40.165658 / -104.670606Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.165730 / -104.670470Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/9/2011
End Date: 11/9/2011
Reported: 12/7/2011
Prior to rule 205A.b.(2)(A)
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2022             Measured TD: 7390 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2022
Wellbore Permit
Permit #:20040280 Expiration Date:2/25/2005
Proposed Depth/Form:7350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW

Wellbore Completed
Completion Date:3/24/2004
Spud Date:3/7/2004Spud Date Is:ACTUAL
Measured TD:7390 ft.Measured PB depth:7352 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, CDCN, CBL, AIL, ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 770 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 0 ft., Bottom: 770 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7368 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 3950 ft., Bottom: 7368 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4347 ft.NN
NIOBRARA7012 ft.NN
FORT HAYS7190 ft.NN
CODELL7213 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/13/2011                Interval Top: 7215 ft.    Interval Bottom: 7230 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/24/2004
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7215 ft.# Of Holes:30
Interval Bottom:7230 ft.Hole Size:0.31 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 4/1/2022                  Interval Top: 7035 ft.    Interval Bottom: 7230 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/21/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/9/2011
Treatment Summary:CDL REPERF (11/1/11) 7215-7229 HOLES 14 SIZE .38 Re-Frac Codell down 4-1/2" Csg w/ 252,336 gal Slickwater w/ 208,840# 40/70, 4,000# SuperLC, 0# .
Formation Treatment
Treatment Date:3/24/2004
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/7/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 8
BTU_GAS 1245
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 21750
CALC_MCF_GAS 174
CASING_PRESS 1500
GRAVITY_OIL 53
MCF_GAS 174
TUBING_PRESS 800
Perforation Data:
Interval Top:7035 ft.# Of Holes:109
Interval Bottom:7230 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/13/2011                Interval Top: 7035 ft.    Interval Bottom: 7092 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2008
Treatment Summary:NEW PERF INTERVALS: 7053-7069', 7080-7092'. 56 PERF'S. 1000 GAL 15% HCL, 65074 GAL FLUID, 99437 GAL GEL, 250380 LBS 20/40 SAND, 4000 LBS 20/40 RESIN COAT SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7035 ft.# Of Holes:107
Interval Bottom:7092 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
03/31/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No