|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/25/2023 Measured TD: 7704 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/25/2023 | | Wellbore Permit | | | Permit #: | 20032567 | Expiration Date: | 2/12/2005 | | Proposed Depth/Form: | 7750 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: SE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: 493-2 , Unit Acreage: 160, Drill Unit: SE/4 |
| | |
| Wellbore Completed | | Completion Date: | 8/3/2004 | | Spud Date: | 7/19/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7704 ft. | Measured PB depth: | 7678 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,MICRO LOG,ARRAY INDUCTION,COMPENSATED NEU. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 639 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 248, Top: 0 ft., Bottom: 639 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7697 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 6300 ft., Bottom: 7697 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4712 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 3080 ft., Bottom: 4712 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4486 ft. | | N | N | | NIOBRARA | 6807 ft. | | N | N | | FORT HAYS | 7064 ft. | | N | N | | CODELL | 7088 ft. | | N | N | | GRANEROS | 7375 ft. | | N | N | | MOWRY | 7533 ft. | | N | N | | J SAND | 7546 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 5/25/2023 Interval Top: 7582 ft. Interval Bottom: 7602 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/1/2004 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/6/2004 | | Treatment Summary: | Frac;d the J sand with 178,500 gal fluid and 219,703 20/40 sand | | Formation Treatment | | Treatment Date: | 8/3/2004 | | Treatment Summary: | JSND RECOMPLETION FRAC'D THE JSND W/178,500 GAL FLUID AND 219,700# 20/40 SAND. 10-06-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7582 ft. | # Of Holes: | 40 | | Interval Bottom: | 7602 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/23/2023 Interval Top: 7088 ft. Interval Bottom: 7104 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/1/2004 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7088 ft. | # Of Holes: | 98 | | Interval Bottom: | 7104 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 7/30/2011 Interval Top: 6808 ft. Interval Bottom: 7602 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/28/2011 | | Treatment Summary: | CIBP SET @ ON 7150 ON 3/14/11 AND DRILLED OUT 5/20/11; CBP SET @ 6970 ON 3/14/11 AND DRILLED OUT 5/19/11. TUBING WAS SET @ 7558 ON 5/20/11 AND THE WELL WAS COMMINGLED ON 5/23/11 | | Formation Treatment | | Treatment Date: | 8/3/2004 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7558 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/28/2011 | Test Method: | FLOW TEST | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 10 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 36400 | | CALC_MCF_GAS | 364 | | CASING_PRESS | 548 | | GRAVITY_OIL | 59 | | MCF_GAS | 364 | | TUBING_PRESS | 388 |
| | Perforation Data: | | Interval Top: | 6808 ft. | # Of Holes: | 226 | | Interval Bottom: | 7602 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 2/23/2023 Interval Top: 6808 ft. Interval Bottom: 6953 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/1/2004 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6808 ft. | # Of Holes: | 88 | | Interval Bottom: | 6953 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/25/2023 Interval Top: 6806 ft. Interval Bottom: 7104 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/1/2004 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/14/2011 | | Treatment Summary: | PERFED NBRR FROM 6808-6826, 6860-6886, 2 SPF, 88 HOLES; FRAC'D 6808-6953 W/ 156,576 GAL FRAC FLUID AND 250,000# SAND
FRAC'D THE CD FROM 7088-7104 WITH 119,490 GAL FRAC FLUID AND 250,820# SAND.
CIBP SET @ 7150 ON 3/14/11 AND DRILLED OUT 5/20/11; CBP SET @ 6970 ON 3/14/11 AND DRILLED OUT 5/19/ | | Formation Treatment | | Treatment Date: | 8/3/2004 | | Treatment Summary: | NIOBRARA-CODELL COMPLETION: FRAC'D THE CODELL 7088'-7104' W/129,400 GAL FLUID AND 300,000# 20/40 SAND. 08/01/04 SET CFP@7050'. FRAC'D THE NIOBRARA 6916'-6953' W/204,800 GAL FLUID AND 301,840# 20/40 SAND.8/4/04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 61 | | BBLS_OIL | 106 | | CALC_BBLS_H2O | 61 | | CALC_BBLS_OIL | 106 | | CALC_GOR | 10396 | | CALC_MCF_GAS | 1102 | | CASING_PRESS | 1254 | | MCF_GAS | 1102 |
| | Perforation Data: | | Interval Top: | 6806 ft. | # Of Holes: | 186 | | Interval Bottom: | 7104 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/25/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|