|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/15/2019 Measured TD: 8190 ft. Vertical TD: 8190 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/15/2019 | | Wellbore Permit | | | Permit #: | 20040109 | Expiration Date: | 2/3/2005 | | Proposed Depth/Form: | 8200 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SE |
| | |
| Wellbore Completed | | Completion Date: | 3/22/2004 | | Spud Date: | 3/5/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8190 ft. | Measured PB depth: | 8145 ft. | | True Vertical TD: | 8190 ft. | True Vertical PB depth: | 8145 ft. | | Log Types: | DIL, CDCN, GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1036 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 375, Top: 0 ft., Bottom: 1036 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8160 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 3160 ft., Bottom: 8160 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4608 ft. | | N | N | | NIOBRARA | 7337 ft. | | N | N | | FORT HAYS | 7580 ft. | | N | N | | CODELL | 7605 ft. | | N | N | | J SAND | 8012 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 4/15/2019 Interval Top: 8012 ft. Interval Bottom: 8052 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/6/2005 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/4/2012 | | Treatment Summary: | REMOVE SAND PLUG @ 7802-8002 TO COMMINGLE JSND WITH NB/CD | | Formation Treatment | | Treatment Date: | 6/3/2010 | | Treatment Summary: | SET SAND PLUG @ 7802'. | | Formation Treatment | | Treatment Date: | 3/22/2004 | | Treatment Summary: | 159185 GAL FLUID; 4000 LBS 12/20 SAND; 115400 LBS 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 13533 | | CALC_MCF_GAS | 203 | | CASING_PRESS | 586 | | GRAVITY_OIL | 50 | | MCF_GAS | 203 | | TUBING_PRESS | 270 |
| | Perforation Data: | | Interval Top: | 8012 ft. | # Of Holes: | 80 | | Interval Bottom: | 8052 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 2/1/2012 Interval Top: 7338 ft. Interval Bottom: 8052 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 1/6/2005 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/4/2012 | | Treatment Summary: | REMOVE SAND PLUG @ 7802-8002 TO COMMINGLE JSND WITH NB/CD. RETURNED DOWNLINE ON 1/19/2012. | | Formation Treatment | | Treatment Date: | 3/22/2004 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7997 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/26/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1294 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 15500 | | CALC_MCF_GAS | 62 | | CASING_PRESS | 450 | | GRAVITY_OIL | 53 | | MCF_GAS | 62 | | TUBING_PRESS | 421 |
| | Perforation Data: | | Interval Top: | 7338 ft. | # Of Holes: | 213 | | Interval Bottom: | 8052 ft. | Hole Size: | 0.45 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/15/2019 Interval Top: 7338 ft. Interval Bottom: 7624 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/24/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/9/2010 | | Treatment Summary: | NBRR PERF 338-7470 HOLES 64 SIZE 0.42. CODL PERF 7606-7624 HOLES 68 SIZE 0.38. REFRAC NBRR W/500 GAL 15% HC1 & 261,890 GAL SW 200,040# 40/70 SAND & 4,000# SB EXCEL. REFRAC CODL W/195,939 GAL SW 150,360# 40/70 AND & 4,000# SB EXCEL. | | Formation Treatment | | Treatment Date: | 3/22/2004 | | Treatment Summary: | 500 GAL BLUID, 144126 GAL FLUID, 116720 LBS 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7555 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/4/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 26 | | BTU_GAS | 1247 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 18 | | CALC_GOR | 6667 | | CALC_MCF_GAS | 120 | | CASING_PRESS | 1138 | | GRAVITY_OIL | 50 | | MCF_GAS | 115 | | TUBING_PRESS | 687 |
| | Perforation Data: | | Interval Top: | 7338 ft. | # Of Holes: | 132 | | Interval Bottom: | 7624 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/15/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|