|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 3/1/2022 Measured TD: 7608 ft. Vertical TD: 7606 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 3/1/2022 | Wellbore Permit | | Permit #: | 20040105 | Expiration Date: | 2/3/2005 | Proposed Depth/Form: | 7600 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SE |
| | |
Wellbore Completed | Completion Date: | 3/22/2004 | Spud Date: | 3/2/2004 | Spud Date Is: | ACTUAL | Measured TD: | 7608 ft. | Measured PB depth: | 7588 ft. | True Vertical TD: | 7606 ft. | True Vertical PB depth: | 7588 ft. | Log Types: | DI, CDCN, GR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 650, Top: 0 ft., Bottom: 904 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7603 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 205, Top: 6440 ft., Bottom: 7606 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4480 ft. | | N | N | NIOBRARA | 7204 ft. | | N | N | FORT HAYS | 7420 ft. | | N | N | CODELL | 7441 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 7/17/2008 Interval Top: 7443 ft. Interval Bottom: 7482 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2004 | Treatment Summary: | NO ADDITIONAL TREATMENT. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7443 ft. | # Of Holes: | 39 | Interval Bottom: | 7482 ft. | Hole Size: | 0.31 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 3/1/2022 Interval Top: 7235 ft. Interval Bottom: 7482 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/18/2008 | Choke Size: | 0.281 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/22/2004 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7414 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/17/2008 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 21 | BTU_GAS | 1250 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 14 | CALC_GOR | 6642 | CALC_MCF_GAS | 93 | CASING_PRESS | 300 | GRAVITY_OIL | 51 | MCF_GAS | 83 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7235 ft. | # Of Holes: | 163 | Interval Bottom: | 7482 ft. | Hole Size: | 0.31 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/17/2008 Interval Top: 7235 ft. Interval Bottom: 7324 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/2/2008 | Treatment Summary: | NEW PERFS FRM 7235-50 & 7308-24'. 62 NEW PERFS. FRAC W/262,626 GAL SLICKWATER & 205,260# 40/70 & 4000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7235 ft. | # Of Holes: | 124 | Interval Bottom: | 7324 ft. | Hole Size: | 0.31 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 12/31/2021 |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|