|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/23/2024 Measured TD: 8009 ft. Vertical TD: 8009 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/23/2024 | | Wellbore Permit | | | Permit #: | 20040050 | Expiration Date: | 1/28/2005 | | Proposed Depth/Form: | 8025 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SW |
| | |
| Wellbore Completed | | Completion Date: | 3/3/2004 | | Spud Date: | 2/17/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8009 ft. | Measured PB depth: | 7991 ft. | | True Vertical TD: | 8009 ft. | True Vertical PB depth: | 7991 ft. | | Log Types: | CDCNL, DIL, GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 808 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 585, Top: 0 ft., Bottom: 808 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8007 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 585, Top: 3980 ft., Bottom: 8007 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4373 ft. | | N | N | | NIOBRARA | 7179 ft. | | N | N | | FORT HAYS | 7381 ft. | | N | N | | CODELL | 7402 ft. | | N | N | | J SAND | 7816 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 10/23/2024 Interval Top: 7825 ft. Interval Bottom: 7832 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2004 | | Treatment Summary: | J SAND 160715 GAL FLUID FRAC INFO REPRESENTS; JSND 400 LBS 12/20 SAND 115310 LBS 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7775 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/24/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 6 | | CALC_BBLS_OIL | 6 | | CALC_GOR | 62500 | | CALC_MCF_GAS | 375 | | CASING_PRESS | 329 | | GRAVITY_OIL | 48 | | MCF_GAS | 375 | | TUBING_PRESS | 258 |
| | Perforation Data: | | Interval Top: | 7825 ft. | # Of Holes: | 74 | | Interval Bottom: | 7832 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/20/2004 Interval Top: 7403 ft. Interval Bottom: 7416 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2004 | | Treatment Summary: | 500 GAL FLUID; 150048 GAL FLUID; 116660# 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7355 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2004 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 16 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 6063 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 330 | | GRAVITY_OIL | 48 | | MCF_GAS | 97 | | TUBING_PRESS | 247 |
| | Perforation Data: | | Interval Top: | 7403 ft. | # Of Holes: | 26 | | Interval Bottom: | 7416 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 4/20/2004 Interval Top: 7189 ft. Interval Bottom: 7207 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | PLUNGER | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2004 | | Treatment Summary: | 500 GAL FLUID; 150048 GAL FLUID; 116660# 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7355 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2004 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 16 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 6063 | | CALC_MCF_GAS | 97 | | CASING_PRESS | 330 | | GRAVITY_OIL | 48 | | MCF_GAS | 97 | | TUBING_PRESS | 247 |
| | Perforation Data: | | Interval Top: | 7189 ft. | # Of Holes: | 10 | | Interval Bottom: | 7207 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 11/24/2004| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/3/2004 | | Treatment Summary: | FRAC INFO REPRESENTS; |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7775 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/24/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 6 | | CALC_GOR | 62500 | | CALC_MCF_GAS | 375 | | CASING_PRESS | 329 | | GRAVITY_OIL | 48 | | MCF_GAS | 375 | | TUBING_PRESS | 258 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 10/23/2024| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/23/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 04/30/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|