|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 11/5/2025 Measured TD: 7380 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 11/5/2025 | | Wellbore Permit | DRIFTED | | Permit #: | 20032586 | Expiration Date: | 1/22/2005 | | Proposed Depth/Form: | 7325 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-1 , Unit Acreage: 80, Drill Unit: S/2NE |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 2/6/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7380 ft. | Measured PB depth: | 7374 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 451 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 451 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7362 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 380, Top: 3880 ft., Bottom: 7362 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3355 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 54 ft., Bottom: 3880 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2900 ft. | | N | N | | PARKMAN | 3718 ft. | | N | N | | SUSSEX | 4116 ft. | | N | N | | SHANNON | 4485 ft. | | N | N | | NIOBRARA | 6864 ft. | | N | N | | FORT HAYS | 7122 ft. | | N | N | | CODELL | 7170 ft. | | N | N | | CARLILE | 7210 ft. | | N | N | | GREENHORN | 7220 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 11/5/2025 Interval Top: 7172 ft. Interval Bottom: 7184 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/23/2012 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/17/2004 | | Treatment Summary: | 2/17/04 BJ SERVICES FRACED W/2534 BBL OF 20 # VISTAR GEL, 217,180# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 27 | | BTU_GAS | 1312 | | CALC_GOR | 5519 | | CASING_PRESS | 190 | | GRAVITY_OIL | 45 | | MCF_GAS | 149 |
| | Perforation Data: | | Interval Top: | 7172 ft. | # Of Holes: | 54 | | Interval Bottom: | 7184 ft. | Hole Size: | 0.40625 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 11/5/2025 Interval Top: 6874 ft. Interval Bottom: 7184 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 2 | | BTU_GAS | 1255 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 1850 | | CALC_MCF_GAS | 37 | | CASING_PRESS | 1526 | | GRAVITY_OIL | 49 | | MCF_GAS | 37 | | TUBING_PRESS | 631 |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 82 | | Interval Bottom: | 7184 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/5/2025 Interval Top: 6874 ft. Interval Bottom: 7004 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/30/2012 | | Treatment Summary: | Nio "A" 6874-6876, "B"6996-7004 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 28 | | Interval Bottom: | 7004 ft. | Hole Size: | 0.421875 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI ) | Y | Defined Inactive 09/30/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|