|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 8/26/2025 Measured TD: 8427 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 8/26/2025 | | Wellbore Permit | | | Permit #: | 20032434 | Expiration Date: | 12/22/2004 | | Proposed Depth/Form: | 8450 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,40766 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: SNSD , Formation: SHANNON , Order: 407-66 , Unit Acreage: 320, Drill Unit: N/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 4350 ft., Bottom: 5300 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/2/2004 | | Spud Date: | 1/15/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 8427 ft. | Measured PB depth: | 8440 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEU. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 719 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 560, Top: 0 ft., Bottom: 719 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8441 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 315, Top: 6850 ft., Bottom: 8441 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5332 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 425, Top: 3880 ft., Bottom: 5332 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4458 ft. | | N | N | | NIOBRARA | 7407 ft. | | N | N | | FORT HAYS | 7730 ft. | | N | N | | CODELL | 7752 ft. | | N | N | | CARLILE | 7772 ft. | | N | N | | BENTONITE | 8014 ft. | | N | N | | MOWRY | 8169 ft. | | N | N | | J SAND | 8187 ft. | | N | N | | SKULL CREEK | 8270 ft. | | N | N | | DAKOTA | 8356 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/26/2025 Interval Top: 8198 ft. Interval Bottom: 8218 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2004 | | Treatment Summary: | DRILL OUT STAGE TOOL. PERF'D THE J SAND FROM 8198'-8218' W/2 SPF. PUMPED 156,400 GAL FRAC FLUID AND 200,480# 30/50 FRAC SAND. FLOW BACK WELL. RIH W/NC/SN, PRODUCTION TBG. LAND PRODUCTION TBG @ 8184'. SWAB. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 46 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 46 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 99200 | | CALC_MCF_GAS | 496 | | CASING_PRESS | 590 | | MCF_GAS | 496 | | TUBING_PRESS | 360 |
| | Perforation Data: | | Interval Top: | 8198 ft. | # Of Holes: | 40 | | Interval Bottom: | 8218 ft. | Hole Size: | 0.35 in. |
|
Formation CODL Formation Classification: GW Status: CM - 5/19/2025 Interval Top: 7753 ft. Interval Bottom: 7770 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2004 | | Treatment Summary: | CODELL RECOMPLETION SET CFP @ 7900' FRAC'D THE CODELL 7753'-7770' W/131,600 GAL FRAC FLUID AND 301,500# SAND. 04-30-04 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 112 | | BBLS_OIL | 99 | | CALC_BBLS_H2O | 112 | | CALC_BBLS_OIL | 99 | | CALC_GOR | 1919 | | CALC_MCF_GAS | 190 | | CASING_PRESS | 900 | | MCF_GAS | 190 |
| | Perforation Data: | | Interval Top: | 7753 ft. | # Of Holes: | 68 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.35 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 10/23/2005 Interval Top: 7753 ft. Interval Bottom: 8218 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.219 in. | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2004 | | Treatment Summary: | JSND-CD COMMINGLE SET CBP @ 7700' AND CFP @ 7900' TO COMMINGLE THE J SAND AND THE CODELL. 05-20-04 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8176 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/22/2004 | Test Method: | FLOWING | | Hours Tested: | 15 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 105 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 105 | | CALC_GOR | 3429 | | CALC_MCF_GAS | 360 | | MCF_GAS | 360 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 7753 ft. | # Of Holes: | 108 | | Interval Bottom: | 8218 ft. | Hole Size: | 0.48 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/30/2005 Interval Top: 7408 ft. Interval Bottom: 8218 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2004 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE/SET CBP @ 7000'. 10/26/05. DRILLED UP CBP @ 7000'. 10/26/05. DRILLED UP CBP @ 7650' TO COMMINGLE THE JSND-NBRR-CDL. 10/26/05. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8180 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/30/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 60 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 60 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 13133 | | CALC_MCF_GAS | 197 | | CASING_PRESS | 740 | | MCF_GAS | 197 | | TUBING_PRESS | 215 |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 268 | | Interval Bottom: | 8218 ft. | Hole Size: | 0.35 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/26/2025 Interval Top: 7408 ft. Interval Bottom: 7770 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/2/2004 | | Treatment Summary: | NBRR-CDL RECOMPLETION/ CODELL PERFORATED AND FRAC'D 04/30/04/ FRAC'D THE CODELL (7753'-7770') WITH 131,600 GAL FRAC FLUID AND 301,500# SAND 04/30/04/ SET CBP @ 7650' 10/18/05. FRAC'D THE NIOBRARA (7408'-7418', 7510'-7540') WITH 200,886 GAL FRAC FLUID AND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 228 | | Interval Bottom: | 7770 ft. | Hole Size: | 0.35 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 5/21/2025 Interval Top: 7408 ft. Interval Bottom: 7540 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 160 | | Interval Bottom: | 7540 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/26/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|