|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/13/2019 Measured TD: 7610 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/13/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20032393 | Expiration Date: | 12/17/2004 | | Proposed Top PZ Location: | Sec:23 Twp: 3N 68W | Footage: 664 FSL 661 FEL | | Bottom Hole Location: | Sec:23 Twp: 3N 68W | Footage: 664 FSL 661 FEL | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 1/27/2004 | | Spud Date: | 1/10/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7610 ft. | Measured PB depth: | 7592 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec:23 Twp: 3N 68W | Footage: 664 FSL 661 FEL | | Bottom Hole Location: | Sec:23 Twp: 3N 68W | Footage: 664 FSL 661 FEL | | Log Types: | CNL/CDL, AIL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 676 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 676 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 495, Top: 3654 ft., Bottom: 7607 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4192 ft. | | N | N | | SHANNON | 4743 ft. | | N | N | | NIOBRARA | 7188 ft. | | N | N | | FORT HAYS | 7434 ft. | | N | N | | CODELL | 7456 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/25/2009 Interval Top: 7458 ft. Interval Bottom: 7472 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2009 | | Treatment Summary: | 156068 GAL SW W/ 115380# 40/70 & 4000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 67 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 2179 | | CALC_MCF_GAS | 146 | | CASING_PRESS | 950 | | GRAVITY_OIL | 46 | | MCF_GAS | 146 | | TUBING_PRESS | 694 |
| | Perforation Data: | | Interval Top: | 7458 ft. | # Of Holes: | 70 | | Interval Bottom: | 7472 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/13/2019 Interval Top: 7201 ft. Interval Bottom: 7472 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/1/2009 | Choke Size: | 0.250 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/27/2004 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/25/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1259 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 14000 | | CALC_MCF_GAS | 28 | | CASING_PRESS | 300 | | GRAVITY_OIL | 48 | | TUBING_PRESS | 14 |
| | Perforation Data: | | Interval Top: | 7201 ft. | # Of Holes: | 150 | | Interval Bottom: | 7472 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/25/2009 Interval Top: 7201 ft. Interval Bottom: 7337 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2009 | | Treatment Summary: | 500 GAL 15% HCI & 237614 GAL SW W/ 200250# 40/70 & 4000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 67 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 67 | | CALC_GOR | 2179 | | CALC_MCF_GAS | 146 | | CASING_PRESS | 950 | | GRAVITY_OIL | 46 | | MCF_GAS | 146 | | TUBING_PRESS | 694 |
| | Perforation Data: | | Interval Top: | 7201 ft. | # Of Holes: | 80 | | Interval Bottom: | 7337 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/13/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|