Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21891
Well Classification: OW Status: PA - 3/22/2019
Well Name/No:SHAFER #7-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/22/2019
FacilityID:270416LocationID:336341
County:WELD #123Location:SWNE 26 2N66W 6
Field:WATTENBERG - #90750Elevation:5084 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2184FNL  2195 FELLat/Long: 40.110486 / -104.742758Lat/Long Source: Field Measured
As Drilled Location:2184 FNL  2195 FELLat/Long: 40.110486 / -104.742758Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 3/22/2019             Measured TD: 8159 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 3/22/2019
Wellbore Permit
Permit #: Expiration Date:3/24/2011
Proposed Depth/Form:8159 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: S/2NE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1023 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 375, Top: 0 ft., Bottom: 1023 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8145 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 295, Top: 6040 ft., Bottom: 8145 ft.

Wellbore Completed
Completion Date:12/30/2003
Spud Date:12/23/2003Spud Date Is:ACTUAL
Measured TD:8159 ft.Measured PB depth:8118 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, DI, CNDL, CBL
Log Types:GR-CCL-CB-VDL RUN 5/12/10 FOR SQUEEZE.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 0 ft., Bottom: 1023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8146 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 5990 ft., Bottom: 8146 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5180 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 4925 ft., Bottom: 5180 ft., Determination Method: CALC
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4910 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 115, Top: 4910 ft., Bottom: 4925 ft., Determination Method: CBL
Casing:String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 4910 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 4200 ft., Bottom: 4908 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 4925 ft., Depth: 5180 ft., Bottom: 5180 ft., Sacks: 175, Method: SQUEEZE
Additional Cement:String Type: SURF , Top: 4908 ft., Depth: 4910 ft., Bottom: 4925 ft., Sacks: 115, Method: SQUEEZE
Additional Cement:String Type: SURF , Top: 4150 ft., Depth: 4910 ft., Bottom: 4908 ft., Sacks: 225, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
SUSSEX4722 ft.
NIOBRARA7261 ft.
FORT HAYS7534 ft.
CODELL7556 ft.
J SAND7996 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 3/22/2019                 Interval Top: 7998 ft.    Interval Bottom: 8034 ft.

 Completed Information for Formation J SAND
1st Production Date:4/13/2004Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/17/2011
Treatment Summary:Drilled out CIBP to commingle well with Sussex and Niobrara/Codell formations on 2/23/2011.
Formation Treatment
Treatment Date:4/28/2010
Treatment Summary:Set CIBP @ 7310’.
Formation Treatment
Treatment Date:1/15/2004
Treatment Summary:160594 GAL FLUID; 4000# 12/20 SAND, 116440# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 15
CALC_BBLS_OIL 15
CALC_GOR 9533
CALC_MCF_GAS 143
CASING_PRESS 457
GRAVITY_OIL 45
MCF_GAS 143
TUBING_PRESS 336
Perforation Data:
Interval Top:7998 ft.# Of Holes:72
Interval Bottom:8034 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/13/2004                 Interval Top: 7758 ft.    Interval Bottom: 7768 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2004
Treatment Summary:599 + 153615 GAL FLUID; 61800# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7980 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/13/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 15
CALC_BBLS_OIL 15
CALC_GOR 9533
CALC_MCF_GAS 143
CASING_PRESS 457
GRAVITY_OIL 45
MCF_GAS 143
TUBING_PRESS 336
Perforation Data:
Interval Top:7758 ft.# Of Holes:22
Interval Bottom:7768 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OG                   Status:  AB - 3/22/2019                 Interval Top: 7334 ft.    Interval Bottom: 7768 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/8/2004Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/17/2011
Treatment Summary:NBRR Perf 7334-7345 Holes 11 Size 0.38 CODL Perf 7758-7768 Holes 20 Size 0.38 Drilled out CIBP to commingle well, Commingled well 2/23/2011 with Sussex and J Sand.
Formation Treatment
Treatment Date:4/28/2010
Treatment Summary:NBRR Perf 7334-7345 Holes 11 Size 0.38 CODL Perf 7758-7768 Holes 20 Size 0.38 Set CIBP @ 7310’.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7334 ft.# Of Holes:31
Interval Bottom:7768 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/13/2004                 Interval Top: 7334 ft.    Interval Bottom: 7345 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:FLFOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/15/2004
Treatment Summary:599 + 153615 GAL FLUID; 61800# 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7980 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/13/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 15
CALC_BBLS_OIL 15
CALC_GOR 9533
CALC_MCF_GAS 143
CASING_PRESS 457
GRAVITY_OIL 45
MCF_GAS 143
TUBING_PRESS 336
Perforation Data:
Interval Top:7334 ft.# Of Holes:6
Interval Bottom:7345 ft.Hole Size:0.38 in.

Formation JNCSX                   Formation Classification:  OW                   Status:  CM - 3/22/2011                 Interval Top: 4724 ft.    Interval Bottom: 8034 ft.

 Completed Information for Formation J-CODELL-NIOBRARA-SUSSEX
1st Production Date:2/23/2011Choke Size: 
Formation Name:J-CODELL-NIOBRARA-SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/17/2011
Treatment Summary:Removed CIBP on 2/17/2011 to commingle all producing formations.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 15
BTU_GAS 1248
CALC_BBLS_OIL 15
CALC_GOR 400
CALC_MCF_GAS 6
CASING_PRESS 130
GRAVITY_OIL 44
MCF_GAS 6
TUBING_PRESS 200
Perforation Data:
Interval Top:4724 ft.# Of Holes:152
Interval Bottom:8034 ft.Hole Size:0.38 in.

Formation SUSX                     Formation Classification:  OG                     Status:  AB - 3/22/2019                 Interval Top: 4724 ft.    Interval Bottom: 4850 ft.

 Completed Information for Formation SUSSEX
1st Production Date:7/30/2010Choke Size: 
Formation Name:SUSSEXCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/23/2011
Treatment Summary:Commingled well with Niobrara/Codell and J Sand formations on 2/23/2011.
Formation Treatment
Treatment Date:6/17/2010
Treatment Summary:Frac SUSX w/ 73,396 gal N2 foam & 1,250,000 scf N2 & 230,280# 16/30 sand & 25,000# 16/30 SiberProp.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 47
BTU_GAS 1248
CALC_BBLS_OIL 47
CALC_GOR 574
CALC_MCF_GAS 27
CASING_PRESS 140
GRAVITY_OIL 43
MCF_GAS 27
TUBING_PRESS 140
Perforation Data:
Interval Top:4724 ft.# Of Holes:49
Interval Bottom:4850 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/22/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No