|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/16/2023 Measured TD: 7250 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/16/2023 | | Wellbore Permit | | | Permit #: | 20032304 | Expiration Date: | 12/8/2004 | | Proposed Depth/Form: | 7440 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SE |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/11/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7250 ft. | Measured PB depth: | 7238 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR, IND, DENSITY, NEUTRON, CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 442 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 442 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7238 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 2775 ft., Bottom: 7238 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2775 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 354, Top: 0 ft., Bottom: 2775 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2795 ft. | | N | N | | PARKMAN | 3625 ft. | | N | N | | SUSSEX | 4175 ft. | | N | N | | SHANNON | 4415 ft. | | N | N | | NIOBRARA | 6690 ft. | | N | N | | FORT HAYS | 6950 ft. | | N | N | | CODELL | 6997 ft. | | N | N | | CARLILE | 7018 ft. | | N | N | | GREENHORN | 7046 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 5/3/2012 Interval Top: 6998 ft. Interval Bottom: 7006 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2012 | | Treatment Summary: | Re-Perf Codell, Frac'd Codell w/ 119 bbl FE-1A pad, 595 bbls 26# pHaser pad, 2004 bbls 26# pHaser fluid system, 217980# 20/40 Preferd Rock, 8000# 20/40 SB Excel. | | Formation Treatment | | Treatment Date: | 1/21/2004 | | Treatment Summary: | 01/21/04 BJ SERVICES FRACED WITH 2706 BBL OF 20# VISTAR GEL, 218500# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 22 | | BBLS_OIL | 203 | | BTU_GAS | 1349 | | CALC_GOR | 2221 | | CASING_PRESS | 260 | | GRAVITY_OIL | 49 | | MCF_GAS | 451 |
| | Perforation Data: | | Interval Top: | 6998 ft. | # Of Holes: | 24 | | Interval Bottom: | 7006 ft. | Hole Size: | 0.40625 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/16/2023 Interval Top: 6708 ft. Interval Bottom: 7006 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/11/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6989 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 29 | | BTU_GAS | 1360 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 2448 | | CALC_MCF_GAS | 71 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 54 | | MCF_GAS | 71 | | TUBING_PRESS | 1300 |
| | Perforation Data: | | Interval Top: | 6708 ft. | # Of Holes: | 52 | | Interval Bottom: | 7006 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 7/18/2012 Interval Top: 6708 ft. Interval Bottom: 6836 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/5/2012 | | Treatment Summary: | Perf'd Niobrara "A" 6708-6710' (4 holes), Niobrara "B" 6828-6836' (24 holes)
Frac'd Niobrara w/ 119 bbl Active pad, 1449 bbls of Slickwater pad, 144 bbls of pHaser 20# pad, 2378 bbls 24# pHaser fluid system and 237340# of 20/42 Preferred Rock, 12000 # 20/40 SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6708 ft. | # Of Holes: | 28 | | Interval Bottom: | 6836 ft. | Hole Size: | 0.421875 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/16/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|