|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 8/28/2018 Measured TD: 8513 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 8/28/2018 | Wellbore Permit | | Permit #: | 20032182 | Expiration Date: | 11/24/2004 | Prop Depth/Form: | 8700 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 320, Drill Unit: E/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
Wellbore Completed | Completion Date: | 11/29/2004 | Spud Date: | 10/22/2004 | Spud Date Is: | ACTUAL | Measured TD: | 8513 ft. | Measured PB depth: | 8507 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, DUAL INDUCTION, COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1205 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 474, Top: 0 ft., Bottom: 1205 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8410 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 255, Top: 6980 ft., Bottom: 8410 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7632 ft. | | N | N | FORT HAYS | 7894 ft. | | N | N | CODELL | 7918 ft. | | N | N | MOWRY | 8338 ft. | | N | N | J SAND | 8351 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 8/28/2018 Interval Top: 8370 ft. Interval Bottom: 8400 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/2/2004 | Treatment Summary: | JSND COMPLETION FRAC'D THE JSND W/206,766 GAL FRAC FLUID AND 300,100# SAND. 11/08/04. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8370 ft. | # Of Holes: | 60 | Interval Bottom: | 8400 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 12/2/2004 Interval Top: 7634 ft. Interval Bottom: 8400 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/2/2004 | Treatment Summary: | DRILLED UP CBP @7800' AND CFP @ 7820' AND CFP @8050' TO COMMINGLE THE JSND-NBRR-CDL. 11/29/04 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8376 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/2/2004 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BBLS_OIL | 88 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 88 | CALC_GOR | 2614 | CALC_MCF_GAS | 230 | CASING_PRESS | 1650 | MCF_GAS | 230 | TUBING_PRESS | 700 |
| Perforation Data: | Interval Top: | 7634 ft. | # Of Holes: | 280 | Interval Bottom: | 8400 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/28/2018 Interval Top: 7634 ft. Interval Bottom: 7940 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/2/2004 | Treatment Summary: | NBRR-CDL RECOMPLETION; SET CFP@ 8050'. 11-09-04 FRAC'D THE CODELL 7920'-7940' W/131,166 GAL FRAC FLUID AND 300,280# 20/40 SAND. 11-14-04. SET CFP@7820' 11-16-04 SET CBP@7800'. 11/16/04. FRAC'D THE NIOBRARA 7634'-7710' W/186,354 GAL FRAC FLUID AND 215,901# |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7634 ft. | # Of Holes: | 220 | Interval Bottom: | 7940 ft. | Hole Size: | 0.9047619 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|