Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21850
Well Classification: GW Status: PA - 2/19/2019
Well Name/No:RASMUSSEN #32-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/19/2019
FacilityID:270251LocationID:332951
Municipality/County:FREDERICK / WELD #123Location:SWNE 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2130FNL  2125 FELLat/Long: 40.111087 / -105.006467Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.111030 / -105.006390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/19/2019             Measured TD: 8211 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/19/2019
Wellbore PermitDRIFTED
Permit #:20054178 Expiration Date:12/5/2006
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4100 ft., Bottom: 5300 ft.

Wellbore Completed
Completion Date:12/4/2006
Spud Date:11/26/2006Spud Date Is:ACTUAL
Measured TD:8211 ft.Measured PB depth:8152 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL,DUAL IND/COMPENSATED DEN/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 565 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 565 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8191 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6470 ft., Bottom: 8191 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5202 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 3850 ft., Bottom: 5202 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4322 ft.NN
NIOBRARA7282 ft.NN
CODELL7580 ft.NN
J SAND8014 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/19/2019                 Interval Top: 8020 ft.    Interval Bottom: 8040 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2006
Treatment Summary:JSND COMPLETION. FRAC'D THE J SAND W/171,520 GALS FRAC FLUID & 250,520# SAND. 12/14/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8020 ft.# Of Holes:40
Interval Bottom:8040 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/10/2007                 Interval Top: 7344 ft.    Interval Bottom: 8040 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/9/2007Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/4/2006
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7430' & 7650' TO COMMINGLE THE JSND-NBRR-CDL. 2/7/07
Tubing Size:2.375 in.Tubing Setting Depth:8012 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/10/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BBLS_OIL 20
CALC_BBLS_H2O 120
CALC_BBLS_OIL 20
CALC_GOR 20600
CALC_MCF_GAS 412
CASING_PRESS 1400
MCF_GAS 412
TUBING_PRESS 1123
Perforation Data:
Interval Top:7344 ft.# Of Holes:160
Interval Bottom:8040 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/19/2019                 Interval Top: 7344 ft.    Interval Bottom: 7600 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2006
Treatment Summary:NBRR-CDL RECOMPLETION. SET CFP @ 7650'. FRAC'D THE CODELL W/ 110,068 GAL FRAC FLUID & 250,840# SAND. 12/14/06. SET CFP @7430'. FRAC'D NBRR W/ 160,400 GAL, 180,000# SAND & 12,000# SOPER LC. 12/14/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7344 ft.# Of Holes:120
Interval Bottom:7600 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/19/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No