|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/19/2019 Measured TD: 8211 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/19/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 20054178 | Expiration Date: | 12/5/2006 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: GRRS , Formation: GRANEROS , Order: , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 4100 ft., Bottom: 5300 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/4/2006 | | Spud Date: | 11/26/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 8211 ft. | Measured PB depth: | 8152 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL,DUAL IND/COMPENSATED DEN/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 565 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 260, Top: 0 ft., Bottom: 565 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8191 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6470 ft., Bottom: 8191 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5202 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 3850 ft., Bottom: 5202 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4322 ft. | | N | N | | NIOBRARA | 7282 ft. | | N | N | | CODELL | 7580 ft. | | N | N | | J SAND | 8014 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/19/2019 Interval Top: 8020 ft. Interval Bottom: 8040 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/14/2006 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND W/171,520 GALS FRAC FLUID & 250,520# SAND. 12/14/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8020 ft. | # Of Holes: | 40 | | Interval Bottom: | 8040 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/10/2007 Interval Top: 7344 ft. Interval Bottom: 8040 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/9/2007 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/4/2006 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7430' & 7650' TO COMMINGLE THE JSND-NBRR-CDL. 2/7/07 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8012 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 120 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 120 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 20600 | | CALC_MCF_GAS | 412 | | CASING_PRESS | 1400 | | MCF_GAS | 412 | | TUBING_PRESS | 1123 |
| | Perforation Data: | | Interval Top: | 7344 ft. | # Of Holes: | 160 | | Interval Bottom: | 8040 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 2/19/2019 Interval Top: 7344 ft. Interval Bottom: 7600 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/14/2006 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP @ 7650'. FRAC'D THE CODELL W/ 110,068 GAL FRAC FLUID & 250,840# SAND. 12/14/06. SET CFP @7430'. FRAC'D NBRR W/ 160,400 GAL, 180,000# SAND & 12,000# SOPER LC. 12/14/06 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7344 ft. | # Of Holes: | 120 | | Interval Bottom: | 7600 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/19/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|