Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21850
Well Classification: GW Status: PA - 2/19/2019
Well Name/No:RASMUSSEN #32-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date2/19/2019
FacilityID:270251LocationID:332951
Municipality/County:FREDERICK / WELD #123Location:SWNE 28 2N68W 6
Field:WATTENBERG - #90750Elevation:4958 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2130FNL  2125 FELLat/Long: 40.111087 / -105.006467Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.111030 / -105.006390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 2/19/2019             Measured TD: 8211 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 2/19/2019
Wellbore PermitDRIFTED
Permit #:20054178 Expiration Date:12/5/2006
Proposed Depth/Form:8300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 4100 ft., Bottom: 5300 ft.

Wellbore Completed
Completion Date:12/4/2006
Spud Date:11/26/2006Spud Date Is:ACTUAL
Measured TD:8211 ft.Measured PB depth:8152 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL,DUAL IND/COMPENSATED DEN/COMP.NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 565 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 0 ft., Bottom: 565 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8191 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6470 ft., Bottom: 8191 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5202 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 3850 ft., Bottom: 5202 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4322 ft.NN
NIOBRARA7282 ft.NN
CODELL7580 ft.NN
J SAND8014 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 2/19/2019                 Interval Top: 8020 ft.    Interval Bottom: 8040 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2006
Treatment Summary:JSND COMPLETION. FRAC'D THE J SAND W/171,520 GALS FRAC FLUID & 250,520# SAND. 12/14/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8020 ft.# Of Holes:40
Interval Bottom:8040 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/10/2007                 Interval Top: 7344 ft.    Interval Bottom: 8040 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/9/2007Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/4/2006
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7430' & 7650' TO COMMINGLE THE JSND-NBRR-CDL. 2/7/07
Tubing Size:2.375 in.Tubing Setting Depth:8012 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/10/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BBLS_OIL 20
CALC_BBLS_H2O 120
CALC_BBLS_OIL 20
CALC_GOR 20600
CALC_MCF_GAS 412
CASING_PRESS 1400
MCF_GAS 412
TUBING_PRESS 1123
Perforation Data:
Interval Top:7344 ft.# Of Holes:160
Interval Bottom:8040 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 2/19/2019                 Interval Top: 7344 ft.    Interval Bottom: 7600 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/14/2006
Treatment Summary:NBRR-CDL RECOMPLETION. SET CFP @ 7650'. FRAC'D THE CODELL W/ 110,068 GAL FRAC FLUID & 250,840# SAND. 12/14/06. SET CFP @7430'. FRAC'D NBRR W/ 160,400 GAL, 180,000# SAND & 12,000# SOPER LC. 12/14/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7344 ft.# Of Holes:120
Interval Bottom:7600 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY02/19/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No