|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/24/2021 Measured TD: 7068 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/24/2021 | | Wellbore Permit | DRIFTED | | Permit #: | 20032012 | Expiration Date: | 10/27/2004 | | Proposed Depth/Form: | 7050 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-6 , Unit Acreage: 80, Drill Unit: S2NWN/ |
| | |
| Wellbore Completed | | Completion Date: | 3/16/2004 | | Spud Date: | 3/1/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 7068 ft. | Measured PB depth: | 7021 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBGR COLLAR CORRELATION LOG (WELLBORE CONDITIONS PREVENTED OPENHOLE LOGS) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 366 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 306, Top: 0 ft., Bottom: 366 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7050 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 6020 ft., Bottom: 7050 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7050 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 6020 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6542 ft. | 6750 ft. | N | N | | CODELL | 6831 ft. | 6847 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/29/2004 Interval Top: 6831 ft. Interval Bottom: 6847 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/16/2004 | | Treatment Summary: | HALLIBURTON FRAC WELL W/263,600# 20/.40 WHITE SAND (OTTOWA), 12,000# ACFRAC-BLACK, 20,000 GAL FR PAD, 5000 GAL SILVERSTIM PAD. TOTAL LOAD 2632 BBLS. WELL SCREENED OUT ON FLUSH. LEFT 7270# ACFRAC SAND IN WELLBORE. CIRCULATE SAND OUT OF ANNULUS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6781 ft. | | Tubing Packer Depth: | 7039 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/29/2004 | Test Method: | FLOWING | | Hours Tested: | 12 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 41 | | BTU_GAS | 1290 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 82 | | CALC_GOR | 4 | | CALC_MCF_GAS | 350 | | CASING_PRESS | 900 | | GRAVITY_OIL | 53 | | MCF_GAS | 175 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 6831 ft. | # Of Holes: | 42 | | Interval Bottom: | 6847 ft. | Hole Size: | 3.125 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/24/2021 Interval Top: 6542 ft. Interval Bottom: 6847 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/22/2004 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/16/2004 | | Treatment Summary: | FRAC NB (6542-6750') W/181,528 GALS FRAC FLUID + 238,000# 20/40 SAND & 12,000# 12/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 34 | | CASING_PRESS | 950 | | MCF_GAS | 158 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 6542 ft. | # Of Holes: | 224 | | Interval Bottom: | 6847 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: Status: CM - 7/1/2019 Interval Top: 6542 ft. Interval Bottom: 6750 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6542 ft. | # Of Holes: | 182 | | Interval Bottom: | 6750 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/24/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|