|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/10/2018 Measured TD: 7855 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/10/2018 | Wellbore Permit | DRIFTED | Permit #: | | Expiration Date: | 2/19/2011 | Proposed Depth/Form: | 7850 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: GRRS , Formation: GRANEROS , Order: 232,318A , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 3/11/2010 | Spud Date: | 3/4/2010 | Spud Date Is: | ACTUAL | Measured TD: | 7855 ft. | Measured PB depth: | 7806 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, DUAL IND/COMPENSATED DENSITY/COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 855 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 295, Top: 0 ft., Bottom: 855 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7841 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 510, Top: 4010 ft., Bottom: 7841 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6969 ft. | | N | N | CODELL | 7244 ft. | | N | N | J SAND | 7690 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/23/2018 Interval Top: 7690 ft. Interval Bottom: 7730 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/16/2010 | Treatment Summary: | J SAND COMPLETION. FRAC'D THE J SAND WITH 154,224 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,220# 20/40 SAND. 03/16-10. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 7690 ft. | # Of Holes: | 36 | Interval Bottom: | 7730 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/28/2010 Interval Top: 7026 ft. Interval Bottom: 7730 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/22/2010 | Treatment Summary: | JSND-CD-NB COMMINGLE. SET CBP @6830' 3/21/10. DRILLED OUT CBP @6830' 3/22/10. DRILLED OUT CFP'S @ 7130' & 7350' TO COMMINGLE JSND-CD-NB 3/22/10 | Formation Treatment | Treatment Date: | 3/16/2010 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. SET CBP @6830'. 03-21-10. DRILLED OUT CBP @6830'. 03-2210. DRILLED OUT CFP'S @ 7130' AND 7350' TO COMMINGLE THE JSND-NBRR-CDL. 03-22-10. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7686 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/21/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 107 | BBLS_OIL | 106 | BTU_GAS | 1130 | CALC_BBLS_H2O | 107 | CALC_BBLS_OIL | 106 | CALC_GOR | 4415 | CALC_MCF_GAS | 468 | CASING_PRESS | 225 | GRAVITY_OIL | 49 | MCF_GAS | 468 |
| Perforation Data: | Interval Top: | 7026 ft. | # Of Holes: | 124 | Interval Bottom: | 7730 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/23/2018 Interval Top: 7026 ft. Interval Bottom: 7260 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/21/2010 | Treatment Summary: | NBRR-CDL COMPLETION. SET CFP @ 7350' 03-15-10. FRAC' THE CODELL WITH 108,948 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,820# 20/40 SAND. 03-16-10. SET CFP @ 7130'. 03-16-10. FRAC'D THE NIOBRARA WITH 132,048 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,960# 20/40 SAND. 03/16/10. | Formation Treatment | Treatment Date: | 3/16/2010 | Treatment Summary: | NB-CD COMPLETION. SET CFP@7650 3/15/10. FRAC'D CD W/108948 GAL 22# VISTAR HYBRID X-LINKED GEL CONTAINING 250820# 20/40 SAND 3/16/10. SET CFP@7130 3/16/10. FRAC'S NB W/132048 GAL 18# VISTAR HYBRID X-LINKED GAL CONTAINING 250960# 20/40 SAND 3/16/10 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/21/2010 | Test Method: | flowing | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 107 | BBLS_OIL | 106 | BTU_GAS | 1130 | CALC_BBLS_H2O | 107 | CALC_BBLS_OIL | 106 | CALC_GOR | 4415 | CALC_MCF_GAS | 468 | CASING_PRESS | 225 | GRAVITY_OIL | 49 | MCF_GAS | 468 |
| Perforation Data: | Interval Top: | 7026 ft. | # Of Holes: | 88 | Interval Bottom: | 7260 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 04/23/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|