|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 9/26/2024 Measured TD: 8280 ft. Vertical TD: 7720 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 9/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20063867 | Expiration Date: | 9/11/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 656 FSL 1927 FEL | | Bottom Hole Location: | Sec:15 Twp: 3N 65W | Footage: 660 FSL 1980 FEL | | Proposed Depth/Form: | 8280 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1118 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 785, Top: 0 ft., Bottom: 1118 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8280 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 770, Top: 3790 ft., Bottom: 8280 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/20/2003 | | Spud Date: | 9/7/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 8280 ft. | Measured PB depth: | 8265 ft. | | True Vertical TD: | 7720 ft. | True Vertical PB depth: | 7705 ft. | | Top PZ Location: | Sec: Twp: | Footage: 656 FSL 1927 FEL | | Bottom Hole Location: | Sec:15 Twp: 3N 65W | Footage: 660 FSL 1980 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 785, Top: 0 ft., Bottom: 1117 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8280 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 6600 ft., Bottom: 8280 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6600 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 3790 ft., Bottom: 6600 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4800 ft. | | N | N | | NIOBRARA | 7500 ft. | | N | N | | FORT HAYS | 7655 ft. | | N | N | | CODELL | 7678 ft. | | N | N | | J SAND | 8115 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 9/26/2024 Interval Top: 8113 ft. Interval Bottom: 8156 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/10/2003 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/11/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7860-8060 TO CM JSND WITH NB/CD | | Formation Treatment | | Treatment Date: | 6/15/2010 | | Treatment Summary: | SET SAND PLUG @ 7860 | | Formation Treatment | | Treatment Date: | 10/20/2003 | | Treatment Summary: | JSND PERFS 10/2003 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 22000 | | CALC_MCF_GAS | 22 | | CASING_PRESS | 1270 | | GRAVITY_OIL | 60 | | MCF_GAS | 22 | | TUBING_PRESS | 1120 |
| | Perforation Data: | | Interval Top: | 8113 ft. | # Of Holes: | 75 | | Interval Bottom: | 8156 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/8/2011 Interval Top: 7668 ft. Interval Bottom: 7682 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/10/2006 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2006 | | Treatment Summary: | PERF & FRAC CODL W/ 151,891 GALS FLUID & 91,000# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7668 ft. | # Of Holes: | 56 | | Interval Bottom: | 7682 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 11/5/2011 Interval Top: 7436 ft. Interval Bottom: 8156 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 10/17/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/11/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7860-8060 TO CM JSND WITH NB/CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/5/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | BTU_GAS | 1270 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 80 | | CASING_PRESS | 751 | | GRAVITY_OIL | 60 | | MCF_GAS | 80 |
| | Perforation Data: | | Interval Top: | 7436 ft. | # Of Holes: | 247 | | Interval Bottom: | 8156 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/26/2024 Interval Top: 7436 ft. Interval Bottom: 7682 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/27/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/28/2010 | | Treatment Summary: | NBRR PERF 7436-7594 HOLES 88 SIZE 0.42 CODL PERF 7668-7682 HOLES 0.38
REPERF CODL 7668-7682 HOLES 28 SIZE 0.38
REFRAC CODL W/ 151,931 GAL SW & 115,200# 40/70 SAND & 4,000# SUPERLC | | Formation Treatment | | Treatment Date: | 10/20/2003 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7648 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/1/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1276 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 28778 | | CALC_MCF_GAS | 259 | | CASING_PRESS | 936 | | GRAVITY_OIL | 57 | | TUBING_PRESS | 604 |
| | Perforation Data: | | Interval Top: | 7436 ft. | # Of Holes: | 172 | | Interval Bottom: | 7682 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/8/2011 Interval Top: 7436 ft. Interval Bottom: 7594 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/10/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/9/2006 | | Treatment Summary: | PERF & FRAC NBRR W/ 178,431 GALS FLUID & 273,000#30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7436 ft. | # Of Holes: | 88 | | Interval Bottom: | 7594 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|