Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21638
Well Classification: GW Status: PA - 9/26/2024
Well Name/No:FRICO #15-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/26/2024
FacilityID:269168LocationID:332588
County:WELD #123Location:SWSW 15 3N65W 6
Field:WATTENBERG - #90750Elevation:4805 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:520FSL  1155 FWLLat/Long: 40.219507 / -104.655256Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.219620 / -104.655280Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 9/26/2024             Measured TD: 8280 ft.    Vertical TD: 7720 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 9/26/2024
Wellbore PermitDIRECTIONAL
Permit #:20063867 Expiration Date:9/11/2007
Proposed Top PZ Location:Sec: Twp: Footage: 656 FSL  1927 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65W Footage: 660 FSL  1980 FEL
Proposed Depth/Form:8280 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 1118 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 785, Top: 0 ft., Bottom: 1118 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8280 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 3790 ft., Bottom: 8280 ft.

Wellbore Completed
Completion Date:10/20/2003
Spud Date:9/7/2003Spud Date Is:ACTUAL
Measured TD:8280 ft.Measured PB depth:8265 ft.
True Vertical TD:7720 ft.True Vertical PB depth:7705 ft.
Top PZ Location:Sec: Twp: Footage: 656 FSL  1927 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65WFootage: 660 FSL  1980 FEL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 785, Top: 0 ft., Bottom: 1117 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8280 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 6600 ft., Bottom: 8280 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6600 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 3790 ft., Bottom: 6600 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4800 ft.NN
NIOBRARA7500 ft.NN
FORT HAYS7655 ft.NN
CODELL7678 ft.NN
J SAND8115 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 9/26/2024                 Interval Top: 8113 ft.    Interval Bottom: 8156 ft.

 Completed Information for Formation J SAND
1st Production Date:11/10/2003Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2011
Treatment Summary:REMOVED SAND PLUG SET @ 7860-8060 TO CM JSND WITH NB/CD
Formation Treatment
Treatment Date:6/15/2010
Treatment Summary:SET SAND PLUG @ 7860
Formation Treatment
Treatment Date:10/20/2003
Treatment Summary:JSND PERFS 10/2003
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
CALC_BBLS_H2O 0
CALC_BBLS_OIL 1
CALC_GOR 22000
CALC_MCF_GAS 22
CASING_PRESS 1270
GRAVITY_OIL 60
MCF_GAS 22
TUBING_PRESS 1120
Perforation Data:
Interval Top:8113 ft.# Of Holes:75
Interval Bottom:8156 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/8/2011                 Interval Top: 7668 ft.    Interval Bottom: 7682 ft.

 Completed Information for Formation CODELL
1st Production Date:10/10/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2006
Treatment Summary:PERF & FRAC CODL W/ 151,891 GALS FLUID & 91,000# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7668 ft.# Of Holes:56
Interval Bottom:7682 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 11/5/2011                 Interval Top: 7436 ft.    Interval Bottom: 8156 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:10/17/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/11/2011
Treatment Summary:REMOVED SAND PLUG SET @ 7860-8060 TO CM JSND WITH NB/CD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/5/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 4
BTU_GAS 1270
CALC_BBLS_OIL 4
CALC_GOR 20000
CALC_MCF_GAS 80
CASING_PRESS 751
GRAVITY_OIL 60
MCF_GAS 80
Perforation Data:
Interval Top:7436 ft.# Of Holes:247
Interval Bottom:8156 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 9/26/2024                 Interval Top: 7436 ft.    Interval Bottom: 7682 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/27/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2010
Treatment Summary:NBRR PERF 7436-7594 HOLES 88 SIZE 0.42 CODL PERF 7668-7682 HOLES 0.38 REPERF CODL 7668-7682 HOLES 28 SIZE 0.38 REFRAC CODL W/ 151,931 GAL SW & 115,200# 40/70 SAND & 4,000# SUPERLC
Formation Treatment
Treatment Date:10/20/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7648 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/1/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1276
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 28778
CALC_MCF_GAS 259
CASING_PRESS 936
GRAVITY_OIL 57
TUBING_PRESS 604
Perforation Data:
Interval Top:7436 ft.# Of Holes:172
Interval Bottom:7682 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/8/2011                 Interval Top: 7436 ft.    Interval Bottom: 7594 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/10/2006Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2006
Treatment Summary:PERF & FRAC NBRR W/ 178,431 GALS FLUID & 273,000#30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7436 ft.# Of Holes:88
Interval Bottom:7594 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/26/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No