|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/18/2023 Measured TD: 7250 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/18/2023 | Wellbore Permit | | Permit #: | 20031421 | Expiration Date: | 8/19/2004 | Proposed Depth/Form: | 7270 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 9/19/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7250 ft. | Measured PB depth: | 7218 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIGLGR, CDCNGR, CBL | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 523 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 215, Top: 0 ft., Bottom: 523 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7246 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 475, Top: 3530 ft., Bottom: 7246 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1003 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 190, Top: 102 ft., Bottom: 1003 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4117 ft. | | N | N | SHANNON | 4570 ft. | | N | N | NIOBRARA | 6790 ft. | | N | N | FORT HAYS | 7063 ft. | | N | N | CODELL | 7087 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/4/2006 Interval Top: 7086 ft. Interval Bottom: 7106 ft. Completed Information for Formation CODELL | 1st Production Date: | 11/7/2006 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/2/2006 | Treatment Summary: | REPERF & REFRAC CODL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7086 ft. | # Of Holes: | 40 | Interval Bottom: | 7106 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/18/2023 Interval Top: 6820 ft. Interval Bottom: 7106 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 11/7/2006 | Choke Size: | 24.000 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/2/2006 | Treatment Summary: | REFRAC NB-CD W/120,057 GALS FLUID & 262,040# 20/40 SAND. NBRR PERFS 10/3/03 6820-6882 CODL PERFS 10/1/03 7086-7098 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7055 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/4/2006 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 34 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 9 | CALC_GOR | 12667 | CALC_MCF_GAS | 114 | CASING_PRESS | 650 | GRAVITY_OIL | 54 | MCF_GAS | 223 | TUBING_PRESS | 650 |
| Perforation Data: | Interval Top: | 6820 ft. | # Of Holes: | | Interval Bottom: | 7106 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 10/18/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|