|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 4/1/2022 Measured TD: 7535 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 4/1/2022 | Wellbore Permit | | Permit #: | 20031314 | Expiration Date: | 8/11/2004 | Proposed Depth/Form: | 7450 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 11/18/2003 | Spud Date: | 11/4/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7535 ft. | Measured PB depth: | 7480 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | PECNLD, PEAILC, PEMLGR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 766 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 540, Top: 0 ft., Bottom: 766 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7495 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 3900 ft., Bottom: 7495 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4460 ft. | | N | N | NIOBRARA | 7053 ft. | | N | N | FORT HAYS | 7319 ft. | | N | N | CODELL | 7334 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/21/2007 Interval Top: 7334 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/18/2003 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: SI - 4/1/2022 Interval Top: 7082 ft. Interval Bottom: 7346 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/18/2003 | Treatment Summary: | DRILL OUT CIBP |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7293 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/21/2007 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 13 | BTU_GAS | 1222 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 29 | CALC_GOR | 4759 | CALC_MCF_GAS | 138 | CASING_PRESS | 750 | GRAVITY_OIL | 54 | MCF_GAS | 76 | TUBING_PRESS | 550 |
| Perforation Data: | Interval Top: | 7082 ft. | # Of Holes: | | Interval Bottom: | 7346 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/21/2007 Interval Top: 7082 ft. Interval Bottom: 7246 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 5/15/2007 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/17/2007 | Treatment Summary: | REPERF & REFRAC NBRR W/241,789 GALS FLUID & 200,000# 30/50 SAND. 7082-7088 (1SPF), 7098-7102 ( 1 SPF), 7108-7111 (1 SPF), 7116-7158 (1 SPF), 7204-7246 (1 SPF). NBRR PERFS 11/17/2003 7083-7148. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7082 ft. | # Of Holes: | 97 | Interval Bottom: | 7246 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 12/30/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 03/31/2022 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|