|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 6/1/2024 Measured TD: 8154 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 6/1/2024 | Wellbore Permit | | Permit #: | 20031145 | Expiration Date: | 7/13/2004 | Proposed Depth/Form: | 8280 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 160, Drill Unit: NW/4 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: W/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 |
| | |
Wellbore Completed | Completion Date: | 9/22/2003 | Spud Date: | 9/11/2003 | Spud Date Is: | ACTUAL | Measured TD: | 8154 ft. | Measured PB depth: | 8131 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1099 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 387, Top: 0 ft., Bottom: 1099 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8149 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 4740 ft., Bottom: 8149 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4580 ft. | | N | N | NIOBRARA | 7353 ft. | | N | N | FORT HAYS | 7532 ft. | | N | N | CODELL | 7555 ft. | | N | N | CARLILE | 7574 ft. | | N | N | GREENHORN | 7623 ft. | | N | N | MOWRY | 7998 ft. | | N | N | J-2 SAND | 8012 ft. | | N | N | SKULL CREEK | 8122 ft. | | N | N |
Formation JSND Formation Classification: GW Status: TA - 6/1/2024 Interval Top: 8018 ft. Interval Bottom: 8056 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/22/2003 | Treatment Summary: | FRAC'D W/205,162 GAL SLICK WATER CONTAINING 162,020# 20/40 SAND. 09/25/03 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 152 | BBLS_OIL | 27 | CALC_BBLS_H2O | 152 | CALC_BBLS_OIL | 27 | CALC_GOR | 852 | CALC_MCF_GAS | 23 | CASING_PRESS | 880 | MCF_GAS | 23 | TUBING_PRESS | 320 |
| Perforation Data: | Interval Top: | 8018 ft. | # Of Holes: | 84 | Interval Bottom: | 8056 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: TA - 6/1/2024 Interval Top: 7538 ft. Interval Bottom: 7574 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/8/2009 | Treatment Summary: | CDL REFRAC AND RECOMPLETION. SET CBP @ 7630. 11/04/2009. RE-FRAC'D THE CODELL WITH 250040# 20/40 SAND IN 1930 BBLS VISTAR 24 XLF. STAGED SAND FROM 1# TO 5#. TOTAL GELLED FLUID - 2738 BBLS. TOTAL FRAC FLUID - 2880 BBLS. 11/08/2009. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BBLS_OIL | 104 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 104 | CALC_GOR | 4240 | CALC_MCF_GAS | 441 | MCF_GAS | 441 |
| Perforation Data: | Interval Top: | 7538 ft. | # Of Holes: | 80 | Interval Bottom: | 7574 ft. | Hole Size: | 0.35 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 11/22/2009 Interval Top: 7538 ft. Interval Bottom: 8056 ft. Completed Information for Formation J-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/22/2003 | Treatment Summary: | JSND-CDL-COMMINGLE. DRILLED OUT CBP @ 7630 TO COMMINGLE THE JSND-CDL. 11/11/2009. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8007 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/22/2009 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 10 | BTU_GAS | 1314 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 10 | CALC_GOR | 4300 | CALC_MCF_GAS | 43 | CASING_PRESS | 340 | GRAVITY_OIL | 53 | MCF_GAS | 43 | TUBING_PRESS | 150 |
| Perforation Data: | Interval Top: | 7538 ft. | # Of Holes: | 164 | Interval Bottom: | 8056 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | Y | 09/23/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 01/31/2021 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|