|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/15/2021 Measured TD: 7744 ft. Vertical TD: 7269 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/15/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20031026 | Expiration Date: | 7/8/2004 | | Proposed Top PZ Location: | Sec:14 Twp: 3N 65W | Footage: 660 FNL 1980 FWL | | Bottom Hole Location: | Sec:14 Twp: 3N 65W | Footage: 660 FNL 1980 FWL | | Proposed Depth/Form: | 7270 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2 |
| | |
| Wellbore Completed | | Completion Date: | 9/5/2003 | | Spud Date: | 7/28/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 7744 ft. | Measured PB depth: | 7717 ft. | | True Vertical TD: | 7269 ft. | True Vertical PB depth: | 7242 ft. | | Top PZ Location: | Sec:14 Twp: 3N 65W | Footage: 660 FNL 1980 FWL | | Bottom Hole Location: | Sec:14 Twp: 3N 65W | Footage: 660 FNL 1980 FWL | | Log Types: | CBL, OPEN HOLE LOGS NOT RUN | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 678 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 475, Top: 0 ft., Bottom: 678 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7733 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 530, Top: 4310 ft., Bottom: 7733 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7733 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 270, Top: 4350 ft., Bottom: 6000 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7260 ft. | | N | N | | CODELL | 7560 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/14/2010 Interval Top: 7556 ft. Interval Bottom: 7574 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/31/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/19/2010 | | Treatment Summary: | Drill out CIBP set @ 7520' to commingle CODL w/ NBRR.
Reperf CODL 7556-7566 Holes 40 Size 0.38.
Refrac CODL w/ 165,102 gal SW & 116,000# 40/70 sand & 4,000# 20/40 SuperLC. | | Formation Treatment | | Treatment Date: | 9/5/2003 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7556 ft. | # Of Holes: | 54 | | Interval Bottom: | 7574 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/15/2021 Interval Top: 7264 ft. Interval Bottom: 7574 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/31/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/19/2010 | | Treatment Summary: | NBRR Perf 7264-7436 Holes 122 Size 0.42 CODL Perf 7556-7574 Holes 54 Size 0.38 | | Formation Treatment | | Treatment Date: | 9/5/2003 | | Treatment Summary: | NIOBRARA PERFS; 7265'-7335' CODELL PERFS; 7560'-7574' FRAC NB-CD W/267820# 20/40 MESH; 108660 GAL. SAND LADEN FLUID |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7515 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 8 | | BTU_GAS | 1184 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 17125 | | CALC_MCF_GAS | 137 | | CASING_PRESS | 828 | | GRAVITY_OIL | 57 | | MCF_GAS | 137 | | TUBING_PRESS | 491 |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 176 | | Interval Bottom: | 7574 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/14/2010 Interval Top: 7264 ft. Interval Bottom: 7436 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/12/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/31/2010 | | Treatment Summary: | No additional treatement. | | Formation Treatment | | Treatment Date: | 7/10/2007 | | Treatment Summary: | REPERF AND REFRAC NBRR W/171,253 GAL FLUID AND 250,000# 30/50 SAND. NBRR A 7264-7278 (3SPF) NBRR B 7318-7334 (3SPF) NBRR C 7410-7436 (1SPF) NBRR PERFS 09/04/2003 7265-7335 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | BTU_GAS | 1261 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 30143 | | CALC_MCF_GAS | 211 | | CASING_PRESS | 675 | | GRAVITY_OIL | 54 | | MCF_GAS | 211 | | TUBING_PRESS | 600 |
| | Perforation Data: | | Interval Top: | 7264 ft. | # Of Holes: | 122 | | Interval Bottom: | 7436 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/15/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|