|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/9/2019 Measured TD: 7333 ft. Vertical TD: 7264 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/9/2019 | Wellbore Permit | DIRECTIONAL | Permit #: | 20030940 | Expiration Date: | 6/5/2004 | Proposed Top PZ Location: | Sec: Twp: | Footage: 800 FNL 1880 FEL | Bottom Hole Location: | Sec: Twp: | Footage: 800 FNL 1880 FEL | Proposed Depth/Form: | 7260 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE |
| | |
Wellbore Completed | Completion Date: | 9/8/2003 | Spud Date: | 8/21/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7333 ft. | Measured PB depth: | 7311 ft. | True Vertical TD: | 7264 ft. | True Vertical PB depth: | 7242 ft. | Top PZ Location: | Sec: Twp: | Footage: 800 FNL 1880 FEL | Bottom Hole Location: | Sec: Twp: | Footage: 800 FNL 1880 FEL | Log Types: | PEAICL, PECNLD, PEMLGR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 665 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 465, Top: 0 ft., Bottom: 665 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7328 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 440, Top: 3784 ft., Bottom: 7328 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7328 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 3850 ft., Bottom: 5200 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4355 ft. | | N | N | NIOBRARA | 6998 ft. | | N | N | CODELL | 7174 ft. | | N | N |
Formation NB-CD Formation Classification: GW Status: AB - 12/9/2019 Interval Top: 6904 ft. Interval Bottom: 7190 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 7/18/2006 | Choke Size: | 0.281 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/7/2006 | Treatment Summary: | 164,308 GALS FLUID & 116,760 LBS 30/50 SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7152 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/1/2006 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 7 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 7 | CALC_GOR | 12285 | CALC_MCF_GAS | 86 | CASING_PRESS | 850 | GRAVITY_OIL | 51 | MCF_GAS | 86 | TUBING_PRESS | 691 |
| Perforation Data: | Interval Top: | 6904 ft. | # Of Holes: | 28 | Interval Bottom: | 7190 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 12/09/2019 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|