Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21522
Well Classification: GW Status: PA - 1/23/2024
Well Name/No:FRICO #6-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date1/23/2024
FacilityID:268144LocationID:336688
County:WELD #123Location:SWNE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2116FNL  1632 FELLat/Long: 40.226777 / -104.626746Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.226860 / -104.626610Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 1/23/2024             Measured TD: 8065 ft.    Vertical TD: 7722 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 1/23/2024
Wellbore PermitDIRECTIONAL
Permit #:20063863 Expiration Date:9/11/2007
Proposed Top PZ Location:Sec: Twp: Footage: 1960 FNL  3280 FEL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  3300 FEL
Proposed Depth/Form:8065 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 667 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 485, Top: 0 ft., Bottom: 667 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8053 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 517, Top: 4150 ft., Bottom: 8053 ft.

Wellbore Completed
Completion Date:8/14/2003
Spud Date:6/18/2003Spud Date Is:ACTUAL
Measured TD:8065 ft.Measured PB depth:8053 ft.
True Vertical TD:7722 ft.True Vertical PB depth:7710 ft.
Top PZ Location:Sec: Twp: Footage: 1960 FNL  3280 FEL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  3300 FEL
Log Types:PEAILC, PECNLD, PEMLGR, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 667 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 0 ft., Bottom: 667 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8053 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 517, Top: 4155 ft., Bottom: 8053 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4664 ft.NN
NIOBRARA7160 ft.NN
FORT HAYS7421 ft.NN
CODELL7446 ft.NN
J SAND7904 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 1/23/2024                 Interval Top: 7905 ft.    Interval Bottom: 7939 ft.

 Completed Information for Formation J SAND
1st Production Date:9/3/2003Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/21/2010
Treatment Summary:DRILL OUT SAND PLUG @ 7715 TO COMMINGLE JSND W/ NB-CD.
Formation Treatment
Treatment Date:8/14/2003
Treatment Summary:JSND PERFS 8/2003
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 4
BTU_GAS 1278
CALC_BBLS_H2O 0
CALC_BBLS_OIL 4
CALC_GOR 42750
CALC_MCF_GAS 7
CASING_PRESS 607
GRAVITY_OIL 60
MCF_GAS 171
TUBING_PRESS 387
Perforation Data:
Interval Top:7905 ft.# Of Holes:72
Interval Bottom:7939 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/22/2020                Interval Top: 7445 ft.    Interval Bottom: 7459 ft.

 Completed Information for Formation CODELL
1st Production Date:10/18/2006Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/12/2006
Treatment Summary:PERF & FRAC CODL W/ 169,441 GALS FLUID & 115,300# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7445 ft.# Of Holes:56
Interval Bottom:7459 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 1/23/2024                 Interval Top: 7168 ft.    Interval Bottom: 7459 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/18/2006Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2010
Treatment Summary:NBRR PERF 7168-7320 HOLES 132 SIZE 0.42 CODL PERF 7445-7459 HOLES 56 SIZE0.38 NO ADDITIONAL TREATMENT.
Formation Treatment
Treatment Date:8/14/2003
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1278
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 30200
CALC_MCF_GAS 151
CASING_PRESS 607
GRAVITY_OIL 60
TUBING_PRESS 387
Perforation Data:
Interval Top:7168 ft.# Of Holes:188
Interval Bottom:7459 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/22/2020                Interval Top: 7168 ft.    Interval Bottom: 7320 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/18/2006Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/12/2006
Treatment Summary:PERF & FRAC NBRR W/ 202,305 GALS FLUID & 160,740# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7168 ft.# Of Holes:132
Interval Bottom:7320 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY01/23/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No