Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21519
Well Classification: OW Status: PA - 12/7/2023
Well Name/No:FRICO #5-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/7/2023
FacilityID:268107LocationID:336688
County:WELD #123Location:SWNE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2152FNL  1666 FELLat/Long: 40.226677 / -104.626866Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.226810 / -104.626670Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 12/7/2023             Measured TD: 7914 ft.    Vertical TD: 7249 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 12/7/2023
Wellbore PermitDIRECTIONAL
Permit #:20030863 Expiration Date:5/29/2004
Proposed Top PZ Location:Sec: Twp: Footage: 1988 FNL  783 FWL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  660 FWL
Proposed Depth/Form:7285 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NW

Wellbore Completed
Completion Date:9/2/2003
Spud Date:6/30/2003Spud Date Is:ACTUAL
Measured TD:7914 ft.Measured PB depth:7881 ft.
True Vertical TD:7249 ft.True Vertical PB depth:7216 ft.
Top PZ Location:Sec: Twp: Footage: 1988 FNL  783 FWL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  660 FWL
Log Types:PEAILC, PECNLS, PERMLGR, CBL
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1694 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1270, Top: 0 ft., Bottom: 1694 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 4.5 in., Top: 0 ft., Depth: 7908 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 3520 ft., Bottom: 7908 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7908 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 3700 ft., Bottom: 5500 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4708 ft.NN
NIOBRARA7452 ft.NN
FORT HAYS7731 ft.NN
CODELL7764 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 6/15/2022                 Interval Top: 7764 ft.    Interval Bottom: 7780 ft.

 Completed Information for Formation CODELL
1st Production Date:9/11/2003Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2008
Treatment Summary:NEW PERF INTERVAL: 7764-7780. 64 NEW PERFS. 162,557 GAL FLUID, 89,930 LBS OF 30/50 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7764 ft.# Of Holes:76
Interval Bottom:7780 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 12/7/2023                 Interval Top: 7466 ft.    Interval Bottom: 7780 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/11/2003Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/2/2003
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 24
BTU_GAS 1261
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 88000
CALC_MCF_GAS 176
CASING_PRESS 1908
GRAVITY_OIL 57
MCF_GAS 256
TUBING_PRESS 176
Perforation Data:
Interval Top:7466 ft.# Of Holes:158
Interval Bottom:7780 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 6/15/2022                 Interval Top: 7466 ft.    Interval Bottom: 7618 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/11/2003Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2008
Treatment Summary:NEW PERF INTERVALS: "A" 7470-7478, "B" 7520-7528, "C" 7612-7618. 66 PERF'S. 1000 GALS 15% HCL, 264,428 GAL FLUID, 225,697 LBS 30/50 SAND, 8000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7466 ft.# Of Holes:82
Interval Bottom:7618 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/07/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No