Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21518
Well Classification: GW Status: PA - 12/12/2024
Well Name/No:FRICO #7-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date12/12/2024
FacilityID:268106LocationID:336688
County:WELD #123Location:SWNE 14 3N65W 6
Field:WATTENBERG - #90750Elevation:4811 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2080FNL  1598 FELLat/Long: 40.226867 / -104.626626Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.226930 / -104.626550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/4/2011
End Date: 5/4/2011
Reported: 5/25/2011
Prior to rule 205A.b.(2)(A)
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 12/12/2024             Measured TD: 7275 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 12/12/2024
Wellbore PermitDIRECTIONAL
Permit #:20030865 Expiration Date:5/29/2004
Proposed Top PZ Location:Sec: Twp: Footage: 1980 FNL  1880 FEL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  1880 FEL
Proposed Depth/Form:7250 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2NE

Wellbore Completed
Completion Date:8/29/2003
Spud Date:6/10/2003Spud Date Is:ACTUAL
Measured TD:7275 ft.Measured PB depth:7254 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1980 FNL  1880 FEL
Bottom Hole Location:Sec: Twp: Footage: 1980 FNL  1880 FEL
Log Types:PECNLD, PEAILC, PEM, PECV, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 667 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 667 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7268 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 3382 ft., Bottom: 7268 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 3450 ft., Bottom: 4700 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6832 ft.NN
FORT HAYS7095 ft.NN
CODELL7117 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 6/10/2022                 Interval Top: 7119 ft.    Interval Bottom: 7133 ft.

 Completed Information for Formation CODELL
1st Production Date:9/11/2003Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2011
Treatment Summary:CD REPERF 7119-7133 HOLES 42 SIZE .38. Re-Frac Codell down 4-1/2" Csg w/ 263,802 gal Slickwater w/ 208,320# 40/70, 4,000# SB Excel, 0# . CIBP set @ 7100' was removed on 4/25/11.
Formation Treatment
Treatment Date:8/29/2003
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7119 ft.# Of Holes:58
Interval Bottom:7133 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 12/12/2024                Interval Top: 6842 ft.    Interval Bottom: 7133 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:9/11/2003Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2011
Treatment Summary:CDREFRAC
Formation Treatment
Treatment Date:4/12/2007
Treatment Summary:NIOBRARA PERFS; 6849'-6902' CODELL PERFS; 7120'-7128' FRAC'D NB-CD W/366000# 20/40 MESH; 108371 GAL SAND LADEN FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
BTU_GAS 1230
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 39000
CALC_MCF_GAS 117
CASING_PRESS 986
GRAVITY_OIL 57
MCF_GAS 117
TUBING_PRESS 878
Perforation Data:
Interval Top:6842 ft.# Of Holes:149
Interval Bottom:7133 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/10/2022                 Interval Top: 6842 ft.    Interval Bottom: 7006 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/11/2003Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/4/2011
Treatment Summary:CD REFRAC.
Formation Treatment
Treatment Date:4/12/2007
Treatment Summary:REPERF & REFRAC NBRR W/ 242,320 GALS FLUID & 200,360# 30/50 SAND 6842-6860 (1SPF) 6882-6908 (1SPF) 6976-7066 (1SPF) NBRR PERFS 8/21/2003 6849-6856 & 6878-6902
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1261
CALC_BBLS_OIL 2
CALC_GOR 16000
CALC_MCF_GAS 32
CASING_PRESS 680
GRAVITY_OIL 54
TUBING_PRESS 400
Perforation Data:
Interval Top:6842 ft.# Of Holes:91
Interval Bottom:7006 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY12/12/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No