Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21502
Well Classification: GW Status: PA - 6/18/2018
Well Name/No:JESSER #4-2A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/18/2018
FacilityID:267877LocationID:331890
Municipality/County:FORT LUPTON / WELD #123Location:NWNW 2 1N66W 6
Field:WATTENBERG - #90750Elevation:5137 ft.
Planned Location:1120FNL  1120 FWLLat/Long: 40.084234 / -104.749689Lat/Long Source: Calculated From Footages
As Drilled Location:1130 FNL  1122 FWLLat/Long: 40.084203 / -104.749687Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/18/2018             Measured TD: 8205 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/18/2018
Wellbore PermitDRIFTED
Permit #:20092605 Expiration Date:6/29/2011
Proposed Depth/Form:8205 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1179 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 770, Top: 0 ft., Bottom: 1179 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8198 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 475, Top: 3600 ft., Bottom: 8198 ft.

Wellbore Completed
Completion Date:6/20/2003
Spud Date:5/24/2003Spud Date Is:ACTUAL
Measured TD:8205 ft.Measured PB depth:8183 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGLGR, CDCNGR, C B L
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1179 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 770, Top: 0 ft., Bottom: 1179 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8198 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 3588 ft., Bottom: 8198 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4702 ft.NN
NIOBRARA7276 ft.NN
FORT HAYS7572 ft.NN
CODELL7601 ft.NN
J SAND8042 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/18/2018                 Interval Top: 8047 ft.    Interval Bottom: 8076 ft.

 Completed Information for Formation J SAND
1st Production Date:7/1/2003Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/8/2013Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND AND NB/CD PRODUCTION WITH SUSX PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/15/2008
Treatment Summary:NO ADDITIONAL TREATMENT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 3
CALC_BBLS_OIL 3
CALC_GOR 95333
CALC_MCF_GAS 286
CASING_PRESS 170
GRAVITY_OIL 60
MCF_GAS 286
TUBING_PRESS 125
Perforation Data:
Interval Top:8047 ft.# Of Holes:72
Interval Bottom:8076 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/29/2010                 Interval Top: 7600 ft.    Interval Bottom: 7616 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/18/2008
Treatment Summary:FRAC CODELL WITH 187448 GALS SW CONTAINING 150460 40/70 SAND AND 4000 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7600 ft.# Of Holes:64
Interval Bottom:7616 ft.Hole Size:0.38 in.

Formation JDCNB                   Formation Classification:  GW                   Status:  CM - 1/29/2010                 Interval Top: 7378 ft.    Interval Bottom: 8076 ft.

 Completed Information for Formation J-D-CODELL-NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:J-D-CODELL-NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2009
Treatment Summary:11/5/2009 - PLACED CIBP @ 7200' W/2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT CIBP AND CEMENT TO COMMINGLE WELL WITHING THE NEXT 6 MONTHS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JDCNB.
Perforation Data:
Interval Top:7378 ft.# Of Holes:196
Interval Bottom:8076 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/18/2018                 Interval Top: 7378 ft.    Interval Bottom: 7616 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/10/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/8/2013Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND AND NB/CD PRODUCTION WITH SUSX PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/20/2003
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BTU_GAS 1194
CALC_BBLS_OIL 55
CALC_GOR 4182
CALC_MCF_GAS 230
CASING_PRESS 180
GRAVITY_OIL 45
Perforation Data:
Interval Top:7378 ft.# Of Holes:124
Interval Bottom:7616 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/29/2010                 Interval Top: 7378 ft.    Interval Bottom: 7450 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/18/2008
Treatment Summary:PERFORATION INTERVALS FROM 7378-7388' AND 7440-7450'. FRAC NIOBRARA B&C WITH 70089 GALS SW AND 98754 GALS SILVERSTIM CONTAINING 250120 30/50 SAND AND 4000 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7378 ft.# Of Holes:60
Interval Bottom:7450 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/29/2008                 Interval Top: 7278 ft.    Interval Bottom: 8076 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/14/2008Choke Size:0.219 in.
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/20/2003
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:8028 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 26
BTU_GAS 1194
CALC_GOR 7385
CASING_PRESS 180
GRAVITY_OIL 45
MCF_GAS 192
TUBING_PRESS 160
Perforation Data:
Interval Top:7278 ft.# Of Holes:196
Interval Bottom:8076 ft.Hole Size:0.38 in.

Formation JNCSX                   Formation Classification:  GW                   Status:  CM - 2/12/2013                 Interval Top: 4844 ft.    Interval Bottom: 8076 ft.

 Completed Information for Formation J-CODELL-NIOBRARA-SUSSEX
1st Production Date:1/31/2013Choke Size: 
Formation Name:J-CODELL-NIOBRARA-SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/12/2013Treatment End Date:N/A
Treatment Summary:DRILLED OUT CIBP TO COMMINGLE JSND AND NB/CD PRODUCTION WITH SUSX PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8132 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/12/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 18
BTU_GAS 1116
CALC_BBLS_OIL 18
CALC_GOR 7778
CALC_MCF_GAS 140
CASING_PRESS 103
GRAVITY_OIL 48
MCF_GAS 140
TUBING_PRESS 135
Perforation Data:
Interval Top:4844 ft.# Of Holes:244
Interval Bottom:8076 ft.Hole Size:0.42 in.

Formation SUSX                     Formation Classification:  GW                     Status:  AB - 6/18/2018                 Interval Top: 4844 ft.    Interval Bottom: 4950 ft.

 Completed Information for Formation SUSSEX
1st Production Date:12/16/2009Choke Size:0.250 in.
Formation Name:SUSSEXCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2009
Treatment Summary:24,490 GAL FOAM H 70 QUALITY N2 W/ 225,840# 12/20 & 25,500# 12/20 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:4859 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2010Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1317
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_MCF_GAS 0
CASING_PRESS 267
GRAVITY_OIL 47
TUBING_PRESS 17
Perforation Data:
Interval Top:4844 ft.# Of Holes:48
Interval Bottom:4950 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/18/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No