Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21448
Well Classification: GW Status: PA - 11/1/2022
Well Name/No:ARISTOCRAT ANGUS #12-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/1/2022
FacilityID:267878LocationID:332755
County:WELD #123Location:SWNW 8 3N65W 6
Field:WATTENBERG - #90750Elevation:4944 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1701FNL  385 FWLLat/Long: 40.242477 / -104.695408Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.242464 / -104.695365Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/3/2021             Measured TD: 7956 ft.    Vertical TD: 7918 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/3/2021
Wellbore PermitDIRECTIONAL
Permit #:20031357 Expiration Date:8/3/2004
Proposed Top PZ Location:Sec:8 Twp: 3N 65W Footage: 1983 FNL  664 FWL
Bottom Hole Location:Sec:8 Twp: 3N 65W Footage: 1991 FNL  675 FWL
Proposed Depth/Form:7956 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W/2
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-1 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 80, Drill Unit: W/2
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 80, Drill Unit: W/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232,318A , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: W/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 639 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 265, Top: 0 ft., Bottom: 639 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7951 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 6650 ft., Bottom: 7951 ft.

Wellbore Completed
Completion Date:6/10/2003
Spud Date:5/17/2003Spud Date Is:ACTUAL
Measured TD:7956 ft.Measured PB depth:
True Vertical TD:7918 ft.True Vertical PB depth:
Top PZ Location:Sec:8 Twp: 3N 65WFootage: 1983 FNL  664 FWL
Bottom Hole Location:Sec:8 Twp: 3N 65WFootage: 1991 FNL  675 FWL
Log Types:INDUCTION, DENSTIY - NEUTRON, FMI, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 639 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 639 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7951 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 3820 ft., Bottom: 7951 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4721 ft.NN
NIOBRARA7068 ft.NN
CODELL7357 ft.NN
GREENHORN7418 ft.NN
GRANEROS7640 ft.NN
MOWRY7792 ft.NN
J SAND7808 ft.NN
SKULL CREEK7929 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/1/2022                 Interval Top: 7832 ft.    Interval Bottom: 7880 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2003
Treatment Summary:REL RBP#1@7310'. POOH. RIH W/TBG. WASH ONTO RBP#2. LD RBP. RIH W/2ND RETRIEVING HEAD, TBG. REL RBP#2@7320. POOH. RIH W/BIT AND TBG. DRILL OUT 1ST CIBP@7600'. POOH. DRILL OUT 2ND CIBP@7795'. POOH. RIH W/CONEBUSTER MILL AND TBG. CLEAN OUT TO 7884'. RIH W/NC
Tubing Size:2.375 in.Tubing Setting Depth:7044 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BBLS_OIL 20
CALC_BBLS_H2O 23
CALC_BBLS_OIL 25
CALC_GOR 26440
CALC_MCF_GAS 661
CASING_PRESS 920
MCF_GAS 524
TUBING_PRESS 630
Perforation Data:
Interval Top:7832 ft.# Of Holes:90
Interval Bottom:7880 ft.Hole Size:

Formation GRRS                     Formation Classification:  GW                     Status:  AB - 11/1/2022                 Interval Top: 7700 ft.    Interval Bottom: 7740 ft.

 Completed Information for Formation GRANEROS
1st Production Date:8/13/2003Choke Size: 
Formation Name:GRANEROSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2003
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 36
BBLS_OIL 4
CALC_BBLS_H2O 48
CALC_BBLS_OIL 5
CALC_GOR 800
CALC_MCF_GAS 4
CASING_PRESS 0
MCF_GAS 3
TUBING_PRESS 20
Perforation Data:
Interval Top:7700 ft.# Of Holes:80
Interval Bottom:7740 ft.Hole Size:

Formation GRNHN                   Formation Classification:  GW                   Status:  AB - 11/1/2022                 Interval Top: 7410 ft.    Interval Bottom: 7460 ft.

 Completed Information for Formation GREENHORN
1st Production Date:8/13/2003Choke Size: 
Formation Name:GREENHORNCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2003
Treatment Summary:SET CIBP @ 7600'. DUMP BAIL CEMENT ON CIBP. PERF'D THE GREENHORN FROM 7410'-7460' W/ 4 SPF. FRAC'D W/335,450 GAL SLICK WATER W/128,262# 20/40 SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 30
CALC_BBLS_H2O 25
CALC_BBLS_OIL 30
CALC_GOR 19100
CALC_MCF_GAS 573
CASING_PRESS 400
MCF_GAS 573
TUBING_PRESS 20
Perforation Data:
Interval Top:7410 ft.# Of Holes:200
Interval Bottom:7460 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/23/2003                Interval Top: 7358 ft.    Interval Bottom: 7370 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2003
Treatment Summary:SET BP @ 7400'. PERF'D THE CODELL FROM 7358'-7370' 4 SPF. TIH W/TBG FOR 3-WAY FRAC. LAND EOT @ 7233'. FRAC'D W/120,920 GAL GEL & 301,440# 20/40 SAND. FLOW BACK WELL.
Tubing Size:2.375 in.Tubing Setting Depth:7233 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 18
BBLS_OIL 40
CALC_BBLS_H2O 18
CALC_BBLS_OIL 40
CALC_GOR 12900
CALC_MCF_GAS 516
CASING_PRESS 2700
MCF_GAS 516
TUBING_PRESS 2450
Perforation Data:
Interval Top:7358 ft.# Of Holes:48
Interval Bottom:7370 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/1/2022                 Interval Top: 7094 ft.    Interval Bottom: 7370 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/30/2009
Treatment Summary:NBRR & CODL COMMINGLE. RILLED OUT CBP @ 7340. 7/10/09. DRILLED OUT CBP @ 7400' TO COMMINGLE THE NBRR & CODL. 7/12/09
Tubing Size:2.375 in.Tubing Setting Depth:7796 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 11
BTU_GAS 1233
CALC_BBLS_H2O 6
CALC_BBLS_OIL 11
CALC_GOR 32727
CALC_MCF_GAS 360
CASING_PRESS 260
GRAVITY_OIL 63
MCF_GAS 360
Perforation Data:
Interval Top:7094 ft.# Of Holes:408
Interval Bottom:7370 ft.Hole Size:0.41 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/22/2003                Interval Top: 7094 ft.    Interval Bottom: 7280 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/10/2003
Treatment Summary:SET BP@7320'. DUMP 1 SX OF SAND ON RBP, SET SECOND PLUG@7305', RIH W/RETRIEVING HEAD, PKR@ 7262'. POOH. LD PKR. RIH W/RETRIEVING HEAD AND TBG. REL RBP@7305'. POOH. SWAB. RIH W/TBG TO 7300'. ROLL GAS OUT OF HOLE. POOH. LAY DOWN BP. RIH W/RBP, PKR AND TBG.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/22/2003Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 7
CALC_BBLS_H2O 23
CALC_BBLS_OIL 25
CALC_GOR 26440
CALC_MCF_GAS 661
MCF_GAS 294
Perforation Data:
Interval Top:7094 ft.# Of Holes:360
Interval Bottom:7280 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/01/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No