Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21410
Well Classification: GW Status: SI - 3/1/2023
Well Name/No:WEBSTER #41-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date3/1/2023
FacilityID:267069LocationID:331860
County:WELD #123Location:NENE 11 6N65W 6
Field:WATTENBERG - #90750Elevation:4790 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:850FNL  475 FELLat/Long: 40.505634 / -104.622658Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.505720 / -104.622440Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2023             Measured TD: 7339 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2023
Wellbore PermitDRIFTED
Permit #:20030448 Expiration Date:4/7/2004
Proposed Depth/Form:7600 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: N/2NE4

Wellbore Completed
Completion Date:11/14/2003
Spud Date:10/31/2003Spud Date Is:ACTUAL
Measured TD:7339 ft.Measured PB depth:7265 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, IND, DENSITY,NEUTRON, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 451 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 451 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7265 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 6494 ft., Bottom: 7265 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7265 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 2961 ft., Bottom: 6494 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREELEY SAND2840 ft.NN
PARKMAN3660 ft.NN
SUSSEX4250 ft.NN
SHANNON4710 ft.NN
NIOBRARA6880 ft.NN
FORT HAYS7098 ft.NN
CODELL7135 ft.NN
CARLILE7160 ft.NN
GREENHORN7182 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  SI - 3/1/2023                  Interval Top: 7137 ft.    Interval Bottom: 7145 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:CODELLCommingled:No
Production Method:PRODUCING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/14/2003
Treatment Summary:11/14/03 BJ SERVICES FRACED W/2685 BBL OF 20 # VISTAR FLUID SYSTEM, 217,800# OF 20/40 MESH SAND AND 8,000# OF 20/40 MESH SUPER LC RESIN SAND.
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2003Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 107
BTU_GAS 1413
CALC_GOR 2046
CASING_PRESS 900
GRAVITY_OIL 49
MCF_GAS 219
Perforation Data:
Interval Top:7137 ft.# Of Holes:24
Interval Bottom:7145 ft.Hole Size:
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY03/27/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
02/28/2023
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No