Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21405
Well Classification: GW Status: PA - 11/12/2018
Well Name/No:GEIST #22-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/12/2018
FacilityID:266935LocationID:331856
County:WELD #123Location:SENW 32 3N67W 6
Field:WATTENBERG - #90750Elevation:4806 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2170FNL  2015 FWLLat/Long: 40.183726 / -104.916334Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.183768 / -104.916163Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/12/2018             Measured TD: 7870 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/12/2018
Wellbore Permit
Permit #:20030552 Expiration Date:4/3/2004
Proposed Depth/Form:7900 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232/318A , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:2/5/2004
Spud Date:1/21/2004Spud Date Is:ACTUAL
Measured TD:7870 ft.Measured PB depth:7845 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL,MICRO LOG, ARRAY INDUCTION, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 239, Top: 0 ft., Bottom: 722 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7864 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 215, Top: 6620 ft., Bottom: 7864 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4378 ft.NN
NIOBRARA7014 ft.NN
FORT HAYS7256 ft.NN
CODELL7278 ft.NN
CARLILE7303 ft.NN
GREENHORN7322 ft.NN
BENTONITE7554 ft.NN
MOWRY7710 ft.NN
J SAND7726 ft.NN
SKULL CREEK7834 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/12/2018                Interval Top: 7727 ft.    Interval Bottom: 7782 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/5/2004
Treatment Summary:PERF JSNDD FROM 7727-7734',7743-7782' W/2SPF. FRAC W/142,254 GAL HYBRID GEL AND 200,180#20/40 SAND. FLOW BACK WELL. RIH W/PROD TBG. SET EOT @7713'.
Tubing Size:0.6666667 in.Tubing Setting Depth:8 ft.
Tubing Packer Depth:7713 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/6/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CASING_PRESS 285
Perforation Data:
Interval Top:7727 ft.# Of Holes:92
Interval Bottom:7782 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/26/2004                 Interval Top: 7281 ft.    Interval Bottom: 7300 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/5/2004
Treatment Summary:SET CPB @7350'. PERF CODL 7281-7300' W/4 SPF. FRAC W/131,800 GAL FRAC FLUID AND 300,480# SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
CALC_BBLS_OIL 3
CALC_GOR 47667
CALC_MCF_GAS 143
CASING_PRESS 285
MCF_GAS 143
Perforation Data:
Interval Top:7281 ft.# Of Holes:76
Interval Bottom:7300 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 11/12/2018                Interval Top: 7026 ft.    Interval Bottom: 7782 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/5/2004
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7713 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 110
BBLS_OIL 60
CALC_BBLS_H2O 110
CALC_BBLS_OIL 60
CALC_GOR 1267
CALC_MCF_GAS 76
CASING_PRESS 1500
MCF_GAS 76
TUBING_PRESS 845
Perforation Data:
Interval Top:7026 ft.# Of Holes:92
Interval Bottom:7782 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/26/2004                 Interval Top: 7026 ft.    Interval Bottom: 7056 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/5/2004
Treatment Summary:SET 10K FRAC PLUG @7150'. PERF NBRR 'A' FROM 7026-7056' W/2SPF. FRAC W/138,390 GAL FRAC FLUID AND 203,580# SAND. FLOW BACK FRAC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/26/2004Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 3
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 47667
CALC_MCF_GAS 143
CASING_PRESS 285
MCF_GAS 143
Perforation Data:
Interval Top:7026 ft.# Of Holes:60
Interval Bottom:7056 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/12/2018

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/12/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No