Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-21397
Well Classification: GW Status: SI - 4/1/2022
Well Name/No:GEIST #21-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date4/1/2022
FacilityID:266812LocationID:336315
County:WELD #123Location:NENW 32 3N67W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Planned Location:780FNL  1780 FWLLat/Long: 40.187556 / -104.917144Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.187553 / -104.916891Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 4/1/2022             Measured TD: 7851 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 4/1/2022
Wellbore Permit
Permit #:20031488 Expiration Date:8/21/2004
Proposed Depth/Form:7851 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: 318A , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: GRRS , Formation: GRANEROS , Order: 318A , Unit Acreage: 320, Drill Unit: W/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2

Wellbore Completed
Completion Date:7/9/2003
Spud Date:5/20/2003Spud Date Is:ACTUAL
Measured TD:7851 ft.Measured PB depth:7808 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CD/CN, DUAL IND.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 581 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 581 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7850 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 237, Top: 6698 ft., Bottom: 7850 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4110 ft.NN
SHANNON4649 ft.NN
NIOBRARA6986 ft.NN
FORT HAYS7234 ft.NN
CODELL7257 ft.NN
GREENHORN7300 ft.NN
GRANEROS7531 ft.NN
MOWRY7686 ft.NN
J-2 SAND7704 ft.NN
SKULL CREEK7801 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 4/1/2022                  Interval Top: 7692 ft.    Interval Bottom: 7736 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2003
Treatment Summary:PERF'D THE J SAND FROM 7692'-7697',7706'-7736' W/2 SPF. FRAC'D W/155,514# 20/40 SAND. FLOW BACK WELL. RIH W/PROD TBG. LAND TBG @ 7657'. SWAB.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 20
BBLS_OIL 12
CALC_BBLS_H2O 20
CALC_BBLS_OIL 12
CALC_GOR 50000
CALC_MCF_GAS 600
CASING_PRESS 400
MCF_GAS 600
Perforation Data:
Interval Top:7692 ft.# Of Holes:70
Interval Bottom:7736 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/8/2003                 Interval Top: 7318 ft.    Interval Bottom: 7334 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2003
Treatment Summary:SET CIBP@7620'. DUMP 2 SX CMT ON CIBP. PERF'D THE CODELL FROM 7318'-7334' W/4 SPF. RIH W/TBG. LAND EOT@7219'. FRAC'D THE CODELL TRIPLE ENTRY W/120,666 GAL DYNAFLOW-2 CROSSLINKED GEL CONTAINING 300,340# 20/40 SAND. FLOW BACK WELL. TURN WELL OVER TO PROD.
Tubing Size:2.375 in.Tubing Setting Depth:7219 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/8/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 59
BBLS_OIL 16
CALC_BBLS_H2O 59
CALC_BBLS_OIL 16
CALC_GOR 1375
CALC_MCF_GAS 22
CASING_PRESS 1060
MCF_GAS 22
TUBING_PRESS 200
Perforation Data:
Interval Top:7318 ft.# Of Holes:64
Interval Bottom:7334 ft.Hole Size:

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 11/4/2003                 Interval Top: 7318 ft.    Interval Bottom: 7736 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:J-CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2003
Treatment Summary:DRILL CIBP. TIH W/PROD TBG. LAND TBG @ 7684', SWAB. TURN WELL OVER TO PRODUCTION.
Tubing Size:2.375 in.Tubing Setting Depth:7684 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/2003Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 16
CALC_BBLS_H2O 22
CALC_BBLS_OIL 16
CALC_GOR 14938
CALC_MCF_GAS 239
CASING_PRESS 970
MCF_GAS 239
TUBING_PRESS 920
Perforation Data:
Interval Top:7318 ft.# Of Holes:134
Interval Bottom:7736 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 3/14/2009                 Interval Top: 7092 ft.    Interval Bottom: 7736 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2003
Treatment Summary:JSND-NBRR-CDL COMMINGLE RELEASED RBP @ 7200' ON 03-08-09. RELEASED RBP @ 7442' TO COMMINGLE THE JSND-NBRR-CDL. 03-09-09
Tubing Size:2.375 in.Tubing Setting Depth:7668 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/14/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 20
BTU_GAS 1196
CALC_BBLS_H2O 10
CALC_BBLS_OIL 20
CALC_GOR 9550
CALC_MCF_GAS 191
CASING_PRESS 667
GRAVITY_OIL 59
MCF_GAS 191
TUBING_PRESS 144
Perforation Data:
Interval Top:7092 ft.# Of Holes:176
Interval Bottom:7736 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 4/1/2022                  Interval Top: 7092 ft.    Interval Bottom: 7334 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/15/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/9/2003
Treatment Summary:NBRR-CDL REFRAC & RECOMPLETION SET RBP @ 7442'. 02-03-09. RE-FRAC'D THE CODELL WITH 107,562 GALS 26# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,000# 20/40 SAND. 02-10-09 SET RFP @ 662'. 02-10-09. RELEASED ON 02-15-09. SET RBP @ 7200'. 02-15-09. (CONT
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7092 ft.# Of Holes:100
Interval Bottom:7334 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/31/2021
Low ProducingYProduction Period
05/2024 - 04/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No