|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/30/2023 Measured TD: 7724 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/30/2023 | Wellbore Permit | | Permit #: | 20054315 | Expiration Date: | 12/11/2006 | Proposed Depth/Form: | 7724 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 673 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 470, Top: 0 ft., Bottom: 673 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7714 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 4000 ft., Bottom: 7714 ft. |
| | |
Wellbore Completed | Completion Date: | 8/15/2003 | Spud Date: | 3/28/2003 | Spud Date Is: | ACTUAL | Measured TD: | 7724 ft. | Measured PB depth: | 7699 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | DIGLGR, CDCNGR, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 673 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 470, Top: 0 ft., Bottom: 673 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7714 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 4000 ft., Bottom: 7714 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4393 ft. | | N | N | NIOBRARA | 6840 ft. | | N | N | FORT HAYS | 7076 ft. | | N | N | CODELL | 7100 ft. | | N | N | J SAND | 7564 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/30/2023 Interval Top: 7584 ft. Interval Bottom: 7617 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/2/2003 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/27/2011 | Treatment Summary: | SPOT 2600# OF 20/40 SAND TO 7380-7656 | Formation Treatment | Treatment Date: | 7/18/2010 | Treatment Summary: | DRILL OUT SAND PLUG SSET @ 7300 TO COMMINGLE JSND W/ NB-CD. | Formation Treatment | Treatment Date: | 8/15/2003 | Treatment Summary: | FRAC JSND W/65840# 20/40 MESH; 89148 GAL. SAND LADEN FLUID |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 2 | BTU_GAS | 1278 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 7 | CALC_GOR | 15714 | CALC_MCF_GAS | 110 | CASING_PRESS | 806 | GRAVITY_OIL | 60 | MCF_GAS | 117 | TUBING_PRESS | 774 |
| Perforation Data: | Interval Top: | 7584 ft. | # Of Holes: | 80 | Interval Bottom: | 7617 ft. | Hole Size: | 0.45 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/16/2022 Interval Top: 7100 ft. Interval Bottom: 7116 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/22/2006 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/20/2006 | Treatment Summary: | 126,549 GALS FLUID & 82,000# 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7100 ft. | # Of Holes: | 64 | Interval Bottom: | 7116 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/30/2023 Interval Top: 6844 ft. Interval Bottom: 7116 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/22/2006 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/24/2011 | Treatment Summary: | Re-Frac Codell down 4-1/2" Csg w/ 267,624 gal Slickwater w/ 207,200#
30/50, 4,000# SuperLC. | Formation Treatment | Treatment Date: | 7/28/2010 | Treatment Summary: | NBRR PERF 6844-7000 HOLES 98 SIZE 0.42 CODL PERF 7100-7116 HOLES 64 SIZE0.38
NO ADDITIONAL TREATMENT | Formation Treatment | Treatment Date: | 8/15/2003 | Treatment Summary: | SEE BELOW: BRIDGE PLUG IS ACTUALLY SAND PLUG W/ 2500# OF 20/40. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 11 | BTU_GAS | 1231 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 11 | CALC_GOR | 13454 | CALC_MCF_GAS | 148 | CASING_PRESS | 2500 | GRAVITY_OIL | 53 | MCF_GAS | 148 | TUBING_PRESS | 774 |
| Perforation Data: | Interval Top: | 6844 ft. | # Of Holes: | 162 | Interval Bottom: | 7116 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/16/2022 Interval Top: 6844 ft. Interval Bottom: 7000 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 6/22/2006 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/20/2006 | Treatment Summary: | 180,266 GALS FLUID & 250,060# 30/50 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6844 ft. | # Of Holes: | 98 | Interval Bottom: | 7000 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 11/30/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|